共 69 条
- [1] Al-Humaidi H. M.(2010)A fuzzy logic approach to model delays in construction projects using rotational fuzzy fault tree models Civil Engineering and Environmental Systems 27 329-351
- [2] Hadipriono Tan F.(2008)Analysis methods in time-based claims Journal of Construction Engineering and Management 134 242-252
- [3] Arditi D.(2006)Causes of delay in large construction projects International Journal of Project Management 24 349-357
- [4] Pattanakitchamroon T.(1984)Project scheduling using fuzzy set concepts Journal of Construction Engineering and Management 110 189-204
- [5] Assaf S. A.(2013)Why trapezoidal and triangular membership functions work so well: Towards a theoretical explanation Journal of Uncertain Systems 8 164-168
- [6] Al-Hejji S.(2009)Overview of the application of “Fuzzy Techniques” in construction management research Journal of Construction Engineering and Management 135 1241-1252
- [7] Ayyub B. M.(2014)Possibilistic moments for the task duration in fuzzy PERT Journal of Management in Engineering 31 04014071-489
- [8] Haldar A.(2012)Analysing factors affecting delays in Indian construction projects International Journal of Project Management 30 479-146
- [9] Barua A.(2013)Delay causes in Iran gas pipeline projects International Journal of Project Management 31 136-1176
- [10] Mudunuri L. S.(2007)Significant factors causing delay in the UAE construction industry Construction Management and Economics 24 1167-313