A Computerized Method for Delay Risk Assessment Based on Fuzzy Set Theory using MS Project™

被引:0
作者
Cenk Budayan
Irem Dikmen
M. Talat Birgonul
Aydın Ghaziani
机构
[1] Yildiz Technical University,
[2] Dept. of Civil Engineering,undefined
[3] Middle East Technical University,undefined
[4] Dept. of Civil Engineering,undefined
[5] Dorce Prefabricated Building and Construction Industry Trade,undefined
来源
KSCE Journal of Civil Engineering | 2018年 / 22卷
关键词
scheduling; delay analysis; delay assessment; fuzzy set;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we present a computerized method as an add-in to MS Project™ for risk identification and estimation of delay. A delay analysis ontology is incorporated so that the users can identify causes of delay at the activity level and assess frequency and impact of risks using their previous experience, expertise and judgement. Testing and validation findings demonstrate that the software is easy to use and gives reliable results. Decision-makers can use this software during risk identification and planning phases to incorporate their judgment about potential risk sources that may lead to project delay. The outputs of the software make it easy for decision-makers to understand the level of delay risk at the activity level, explore how criticality of activities may change under different risk occurrence scenarios and estimate amount of delay. By utilizing the software, effective risk response and allocation strategies may be formulated to mitigate the delay risk and communicate delay risk information between various project participants.
引用
收藏
页码:2714 / 2725
页数:11
相关论文
共 69 条
  • [1] Al-Humaidi H. M.(2010)A fuzzy logic approach to model delays in construction projects using rotational fuzzy fault tree models Civil Engineering and Environmental Systems 27 329-351
  • [2] Hadipriono Tan F.(2008)Analysis methods in time-based claims Journal of Construction Engineering and Management 134 242-252
  • [3] Arditi D.(2006)Causes of delay in large construction projects International Journal of Project Management 24 349-357
  • [4] Pattanakitchamroon T.(1984)Project scheduling using fuzzy set concepts Journal of Construction Engineering and Management 110 189-204
  • [5] Assaf S. A.(2013)Why trapezoidal and triangular membership functions work so well: Towards a theoretical explanation Journal of Uncertain Systems 8 164-168
  • [6] Al-Hejji S.(2009)Overview of the application of “Fuzzy Techniques” in construction management research Journal of Construction Engineering and Management 135 1241-1252
  • [7] Ayyub B. M.(2014)Possibilistic moments for the task duration in fuzzy PERT Journal of Management in Engineering 31 04014071-489
  • [8] Haldar A.(2012)Analysing factors affecting delays in Indian construction projects International Journal of Project Management 30 479-146
  • [9] Barua A.(2013)Delay causes in Iran gas pipeline projects International Journal of Project Management 31 136-1176
  • [10] Mudunuri L. S.(2007)Significant factors causing delay in the UAE construction industry Construction Management and Economics 24 1167-313