Scheduling for multi-stage applications with scalable virtual resources in cloud computing

被引:0
|
作者
Jie Zhu
Xiaoping Li
机构
[1] Nanjing University of Posts and Telecommunications,School of Computer Science & Technology
[2] Nanjing University of Posts and Telecommunications,Institute of Computer Technology
[3] Southeast University,School of Computer Science & Engineering
关键词
Hybrid flowshop; Deadline-constraint; Scalability ; Cloud computing;
D O I
暂无
中图分类号
学科分类号
摘要
Nowadays multi-stage computing applications are widespread and they are suitable for being executed in cloud platforms, where virtual resources are provisioned on-demand. By specific rules, virtual resources are automatically scaled out/in according to workloads. In this paper, we model processes of multi-stage computing applications on scalable resources as hybrid flowshop scheduling with deadline constraints. The objective is to minimize the number of scaled-out virtual machines. For the NP-hard problem under study, which has not been explored yet, we propose two greedy methods SNG and SENG. Based on benchmark instances, the performance of the two methods are evaluated and compared. For small-size, medium-size and large-size instances, SENG can averagely save up to 38.99, 33.04 and 29.98 % of VMs, respectively. While SNG can averagely save up to 24.5, 25.38 and 28.87 %, respectively. The CPU time consumed by SENG is averagely one time more than that of SNG.
引用
收藏
页码:1633 / 1641
页数:8
相关论文
共 50 条
  • [21] Method of multiagent scheduling of resources in cloud computing environments
    Kalyaev, A. I.
    Kalyaev, I. A.
    JOURNAL OF COMPUTER AND SYSTEMS SCIENCES INTERNATIONAL, 2016, 55 (02) : 211 - 221
  • [22] Value of information based scheduling of cloud computing resources
    Boeloeni, Ladislau
    Turgut, Damla
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2017, 71 : 212 - 220
  • [23] Virtual Machines Scheduling Algorithm Based on Multi-objective Optimization in Cloud Computing
    Zhu, JianRong
    Zhuang, Yi
    Li, Jing
    Zhu, Wei
    ADVANCED DEVELOPMENT OF ENGINEERING SCIENCE IV, 2014, 1046 : 508 - 511
  • [24] Appointment scheduling in multi-stage outpatient clinics
    Klassen, Kenneth J.
    Yoogalingam, Reena
    HEALTH CARE MANAGEMENT SCIENCE, 2019, 22 (02) : 229 - 244
  • [25] Reachability and Deadlocking Problems in Multi-stage Scheduling
    Eggermont, Christian E. J.
    Woeginger, Gerhard J.
    REACHABILITY PROBLEMS, 2011, 6945 : 153 - 164
  • [26] Batching and scheduling in a multi-stage kanban system
    Sarker, BR
    Balan, CV
    6TH INDUSTRIAL ENGINEERING RESEARCH CONFERENCE PROCEEDINGS: (IERC), 1997, : 674 - 679
  • [27] Financial optimisation of the scheduling for the multi-stage project
    Klimek, M.
    Lebkowski, P.
    BULLETIN OF THE POLISH ACADEMY OF SCIENCES-TECHNICAL SCIENCES, 2017, 65 (06) : 899 - 908
  • [28] Multi Cloud Deployment with Migration of Virtual Resources for Effective Resource Allocation for Green Computing
    Deepika, A.
    Vijay, K.
    RESEARCH JOURNAL OF PHARMACEUTICAL BIOLOGICAL AND CHEMICAL SCIENCES, 2016, 7 (04): : 3131 - 3138
  • [29] Scalable Fog Computing Orchestration for Reliable Cloud Task Scheduling
    Lim, Jongbeom
    APPLIED SCIENCES-BASEL, 2021, 11 (22):
  • [30] Appointment scheduling in multi-stage outpatient clinics
    Kenneth J. Klassen
    Reena Yoogalingam
    Health Care Management Science, 2019, 22 : 229 - 244