共 188 条
[1]
Agrawal S(2008)A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem International Journal of Production Research 46 1405-1429
[2]
Tiwari MK(2011)A hybrid genetic algorithm for mixed model assembly line balancing problem with parallel workstations and zoning constraints Engineering Applications of Artificial Intelligence 24 449-457
[3]
Akpınar S(2008)Profit-oriented disassembly-line balancing International Journal of Production Research 46 2675-2693
[4]
Bayhan GM(2018)A multi-objective simulation-based optimization approach for inventory replenishment problem with premium freights in convergent supply chains Omega 80 153-165
[5]
Altekin FT(2013)A heuristic for U-shaped disassembly line balancing problems MIT International Journal of Mechanical Engineering 3 51-56
[6]
Kandiller L(2012)A new U-shaped heuristic for disassembly line balancing problems Pratibha International Journal of Science, Spirituality, Business and Technology 1 2277-7261
[7]
Ozdemirel NE(2013)Multi-objective optimization of stochastic disassembly line balancing with station paralleling Computers & Industrial Engineering 65 413-425
[8]
Avci MG(2018)A goal programming model for sustainable reverse logistics operations planning and an application Journal of Cleaner Production 201 1081-1091
[9]
Selim H(2014)Disassembly line balancing and sequencing under uncertainty Procedia CIRP 15 239-244
[10]
Avikal S(2014)Lagrangian relaxation for stochastic disassembly line balancing problem Procedia CIRP 17 56-60