共 47 条
[1]
Caccetta L(2003)An application of branch and cut to open pit mine scheduling J Glob Optim 27 349-365
[2]
Hill S(2010)A strengthened formulation and cutting planes for the open pit mine production scheduling problem Comput Oper Res 37 1641-1647
[3]
Bley A(1982)Optimum scheduling of overburden removal in open pit mines CIM Bull 75 154-163
[4]
Boland N(1982)Optimum scheduling of overburden removal in open pit mines CIM Bull 75 22-31
[5]
Fricke C(1995)Mine production scheduling for optimization of plant recovery in surface phosphate operations Int J Min Reclam Environ 9 41-46
[6]
Froyland G(1985)A production problem in phosphate mining J Oper Res Soc 36 285-288
[7]
Lizotte Y(2008)Long-term open pit mine production planning: a review of models and algorithms Int J Min Reclam Environ 22 3-35
[8]
Elbrond J(2010)A review of operations research in mine planning Interfaces 40 222-245
[9]
Yun Q(2012)New approach to flexible open pit optimisation and scheduling Min Technol 121 132-138
[10]
Yegulalp T(2012)A new algorithm for the open-pit mine production scheduling problem Oper Res 60 517-528