Modeling of dynamic train–bridge interaction in high-speed railways

被引:0
|
作者
Patrick Salcher
Christoph Adam
机构
[1] University of Innsbruck,Unit of Applied Mechanics
来源
Acta Mechanica | 2015年 / 226卷
关键词
Railway Bridge; Deck Plate; Main Girder; Component Mode Synthesis; Bridge Interaction;
D O I
暂无
中图分类号
学科分类号
摘要
For analyzing the dynamic interaction problem of a train passing a railway bridge with high speed, a substructure approach is presented taking into account the influence of rail irregularities. Modal analysis provides a description of the finite element bridge model in modal space with a small number of degrees of freedom. The train is modeled as a sequence of multibody mass–spring–damper systems. A linear interaction model in the context of a component mode synthesis method is used for coupling the two substructures. In a numerical example, the dynamic response of a single-span steel bridge subjected to a high-speed train is analyzed showing the efficiency of the proposed approach. The results of this example demonstrate the importance of considering rail irregularities for a reliable prediction of the acceleration response.
引用
收藏
页码:2473 / 2495
页数:22
相关论文
共 50 条
  • [41] Dynamic soil-structure interaction of a three-span railway bridge subject to high-speed train passage
    Tehrani, Seyed Amin Hosseini
    Andersson, Andreas
    Zanganeh, Abbas
    Battini, Jean-Marc
    ENGINEERING STRUCTURES, 2024, 301
  • [42] Model tests on XCC-piled embankment under dynamic train load of high-speed railways
    Tingting Niu
    Hanlong Liu
    Xuanming Ding
    Changjie Zheng
    Earthquake Engineering and Engineering Vibration, 2018, 17 : 581 - 594
  • [43] MODELING THE DEMAND FOR HIGH-SPEED TRAIN SERVICES
    SHILTON, D
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1982, 33 (08) : 713 - 722
  • [44] MODELING THE DEMAND FOR HIGH-SPEED TRAIN SERVICES
    SHILTON, D
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1981, 32 (12) : 1087 - 1088
  • [45] Estimation of the vibration serviceability deflection limit of a high-speed railway bridge considering the bridge-train interaction and travel speed
    Bub-Gyu Jeon
    Nam-Sik Kim
    Sung-Il Kim
    KSCE Journal of Civil Engineering, 2016, 20 : 747 - 761
  • [46] Estimation of the Vibration Serviceability Deflection Limit of a High-speed Railway Bridge Considering the Bridge-Train Interaction and Travel Speed
    Jeon, Bub-Gyu
    Kim, Nam-Sik
    Kim, Sung-Il
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (02) : 747 - 761
  • [47] Dynamic Behavior of Masonry Arch Bridge under High-Speed Train Loading: Veresk Bridge Case Study
    Rafiee-Dehkharghani, R.
    Ghyasvand, S.
    Sahebalzamani, P.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2018, 32 (03)
  • [48] Influence of bridge structure stiffness on the dynamic performance of high-speed train-track-bridge coupled system
    Zhai, Wanming
    Wang, Shaolin
    Zhongguo Tiedao Kexue/China Railway Science, 2012, 33 (01): : 19 - 26
  • [49] Soil-structure interaction and soil waves due to bridge crossing of high-speed train
    Millan, M.
    Dominguez, J.
    STRUCTURAL DYNAMICS - EURODYN 2005, VOLS 1-3, 2005, : 1057 - 1061
  • [50] Train operation conflict detection for high-speed railways: a naive Bayes approach
    Li, Jie
    Li, Zhongcan
    Wen, Chao
    Peng, Qiyuan
    Huang, Ping
    INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2023, 11 (02) : 188 - 206