Simulation technique-based sensitivity analysis on staircase construction process in high-rise building construction

被引:0
作者
Seungwoo Han
Youngsuk Kim
Seunghoon Jeong
Jongsoo Choi
Sungkwon Woo
机构
[1] Inha University,Dept. of Architectural Engineering
[2] Dongguk University-Seoul campus,Architectural Engineering Dept.
[3] Inha University,Dept. of Civil Engineering
来源
KSCE Journal of Civil Engineering | 2014年 / 18卷
关键词
sensitivity analysis; steel staircase system method; reinforced concrete staircase method; construction simulation;
D O I
暂无
中图分类号
学科分类号
摘要
The construction operation technology is hardly applied due to lack of feasible information on construction performance under various situations which site conditions are reflected. Performance prediction on the targeted technologies to be applied and a performance evaluation method are accordingly required to resolve problems with the onsite application. The objective of this research is to propose an analysis methodology comparing and evaluating the predicted productivity and cost of the onsite application of the targeted construction process, steel staircase system method, and of the reinforced concrete staircase method, using a construction simulation technique as a sensitivity analysis tool. To achieve this objective, a construction simulation based on the data collected at job sites that are applying the two aforementioned construction methods was performed. The results of the sensitivity analysis have been speculated on under the supposition that the two cases were installed with one to three staircases. The deduced hourly productivity and unit cost had prediction values for each case, based on which the performance levels of the two construction methods in various cases were predicted and compared. The methodology proposed in this research is applicable to the performance evaluation of advanced construction technologies with absolutely insufficient raw data.
引用
收藏
页码:389 / 397
页数:8
相关论文
共 31 条
[1]  
Han S(2010)Productivity analysis comparison of different types of earthmoving operations by means of various productivity measurement Journal of Asian Architecture and Building Engineering 9 185-192
[2]  
Han S(2008)Production prediction of conventional and global positioning system-based earthmoving systems using simulation and multiple regression analysis Canadian Journal of Civil Engineering 35 574-587
[3]  
Hong T(2008)Quantified comparison and analysis of different productivity measurements Journal of Asian Architecture and Building Engineering 7 309-316
[4]  
Lee S(2007)Simulation-based determination of optimal life-cycle cost for FRP bridge deck panel Automation in Construction 16 140-152
[5]  
Han S(2002)System formwork Journal of Korean Institute of building Construction 2 39-49
[6]  
Lee S(2010)A study of the productivity analysis of superstructure construction for multihousing projects using construction simulation Journal of the Architectural Institute of Korea 26 123-131
[7]  
Hong T(2010)Construction performance evaluation of steel staircase systems based on construction simulation CYCLONE techniques Journal of Korean Institute of building Construction 10 19-26
[8]  
Han S(2004)A study on the development of the new technology valuation system using case-based reasoning Journal of the Society for e-Business Studies 9 103-116
[9]  
Lee S(2002)A Study of steel staircases workability and economic feasibility in reinforced concrete buildings. Korea Land & Housing Corporation Magazine of Korea Land & Housing Corporation 74 140-148
[10]  
Jeong S(2003)System steel stairs for RC structures Magazine of Korea Concrete Institute 15 61-66