Halting decisions for gas pipeline construction projects using AHP: a case study

被引:0
作者
Tamer F. Abdelmaguid
Waleed Elrashidy
机构
[1] Cairo University,Department of Mechanical Design and Production, Faculty of Engineering
来源
Operational Research | 2019年 / 19卷
关键词
Project risk analysis; Project scheduling; Multicriteria decision making; Analytic hierarchy process; 90B50; 62C25;
D O I
暂无
中图分类号
学科分类号
摘要
This paper considers a decision making problem encountered by a natural gas pipeline construction company having a set of ongoing projects and facing unpredictable risks that can result in large deviations from planned schedules. This situation forces the company to consider the decision of halting one or more projects to avoid future losses and to allow for possible reallocation of some of their resources to other ongoing projects. This decision making problem involves different factors and criteria that need to be combined in an organized structure that exploits assessments of experts managing such projects. The analytic hierarchy process (AHP) is found to be suitable for guiding decisions in this problem. A case study for a major natural gas pipeline construction company in Egypt is presented, where three ongoing projects are considered. The proposed AHP structure, along with collected pairwise comparison scores and calculated priorities, suggests halting one project. Sensitivity analysis is conducted to investigate the effect of changes in the pairwise comparison scores assigned to the main criteria on the final decision. The results and analysis provide some insights regarding the application of the AHP and the relative importance of the factors affecting decisions.
引用
收藏
页码:179 / 199
页数:20
相关论文
共 34 条
[1]  
Abdelgawad M(2010)Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP J Constr Eng Manag 136 1028-1036
[2]  
Fayek A(1990)Systematic risk management approach for construction projects J Constr Eng Manag 116 533-546
[3]  
Al-Bahar JF(2014)Risk management in construction projects Int J Adv Appl Sci Eng 1 162-166
[4]  
Crandall KC(2014)Project cost risk and uncertainties: towards a conceptual cost contingency estimation model Int J Constr Eng Manag 3 144-155
[5]  
Ashan SN(2002)Project risk management: a combined analytic hierarchy process and decision tree approach Cost Eng 44 13-26
[6]  
Sakale R(2004)Decision support system for inspection and maintenance: a case study of oil pipelines IEEE Trans Eng Manage 51 47-56
[7]  
Buertey JIT(2006)Integrated project evaluation and selection using multiple-attribute decision-making technique Int J Prod Econ 103 90-103
[8]  
Dey PK(2010)Managing project risk using combined analytic hierarchy process and risk map Appl Soft Comput 10 990-1000
[9]  
Dey PK(2012)Project risk management using multiple criteria decision-making technique and decision tree analysis: a case study of Indian oil refinery Prod Plan Control 23 903-921
[10]  
Dey PK(2005)Assessing and managing the potential environmental risks of construction projects Pract Period Struct Des Constr 10 260-266