共 75 条
[1]
Orji JIM(2013)Project Scheduling Under Resource Constraints: a Recent Survey Int. J. Eng. Res. Technol. 2 1-20
[2]
Wei S(2013)An Agent-Based Distributed scheduling for crisis management Supply Chain Int. J. Comput. Int. Sys. 6 156-173
[3]
Kaddoussi A(2013)Resource-constraint multi-project scheduling with priorities and uncertain activity durations Int. J. Comput. Int. Sys. 6 530-547
[4]
Zoghlami N(2014)A critical chains based distributed multi-project scheduling approach Neurocomputing 143 282-293
[5]
Hammadi S(2001)An effective hybrid optimization strategy for job-shop scheduling problems Comput. Oper. Res. 28 585-596
[6]
Zgaya H(1992)Job shop scheduling by Simulated Annealing Oper. Res. 40 113-125
[7]
Zheng Z(2010)A hybrid immune simulated annealing algorithm for the job shop scheduling problem Appl. Soft. Comput. 10 79-89
[8]
Shumin L(1999)A simulated annealing algorithm for job shop scheduling Prod. Plan. Control 10 767-777
[9]
Ze G(2007)A comparative study of a new heuristic based on adaptive memory programming and simulated annealing: The case of job shop scheduling Eur. J. Oper. Res. 177 1894-1910
[10]
Yueni Z(2009)‘A simulated annealing algorithm for flexible job-shop scheduling problem’ J. Appl. Sci. 9 662-670