Mathematical modeling and two metaheuristic algorithms for integrated process planning and group scheduling with sequence-dependent setup time

被引:0
作者
Mohammad Reza Hosseinzadeh
Mehdi Heydari
Mohammad Mahdavi Mazdeh
机构
[1] Iran University of Science and Technology,Department of Industrial Engineering
来源
Operational Research | 2022年 / 22卷
关键词
Process planning; Group scheduling; Sequence-dependent setup time; Mathematical modeling; Genetic algorithm; Water cycle algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
The advancement of technology enables manufacturing companies to employ multifunction machines to increase the flexibility of a system in producing miscellaneous products in a short time. In this situation, goods can be usually produced through different process plans, and considering process planning and scheduling in an integrated framework would be essential. Furthermore, group processing is regarded to overcome the difficulty of long setup times and consequently increase the productivity of a manufacturing system. This paper deals with the integrated process planning and group scheduling problem with sequence-dependent setup time between each group of jobs. Two mixed-integer linear programming models with different approaches are presented. Moreover, two metaheuristic algorithms are proposed to solve the problems heuristically. The experiments show the high performance of the combination-based mathematical model for small-size problems as well as the proposed metaheuristic algorithms for medium-size and large-size instances.
引用
收藏
页码:5055 / 5105
页数:50
相关论文
共 197 条
  • [1] Allahverdi A(2015)The third comprehensive survey on scheduling problems with setup times/costs Eur J Oper Res 246 345-378
  • [2] Allahverdi A(1999)A review of scheduling research involving setup considerations Omega 187 985-1032
  • [3] Gupta J(2008)A survey of scheduling problems with setup times or costs Eur J Oper Res 59 273-287
  • [4] Aldowaisan T(2012)A hybrid genetic algorithm for integrated process planning and scheduling problem with precedence constraints Int J Adv Manuf Technol 93 22-48
  • [5] Allahverdi A(2019)Decomposition algorithms for the integrated process planning and scheduling problem Omega 11 161-181
  • [6] Ng CT(2017)Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times Eur J Indust Eng 33 119-142
  • [7] Cheng TCE(1995)A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling Int J Prod Res 47 315-319
  • [8] Kovalyov MY(2009)The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model Int J Prod Res 1 151-166
  • [9] Amin-Naseri MR(1984)Decision making on the factory floor: an integrated approach to process planning and scheduling Robot Comput-Integrat Manuf 110–111 280-288
  • [10] Afshari AJ(2012)Water cycle algorithm—a novel metaheuristic optimization method for solving constrained engineering optimization problems Comput Struct 25 3775-3796