Type II assembly line balancing problem with multi-operators

被引:0
作者
Yuchen Li
Honggang Wang
Zaoli Yang
机构
[1] Beijing University of Technology,Research Base of Beijing Modern Manufacturing Development, School of Economics and Management
[2] University of La Verne,College of Business and Public Management
来源
Neural Computing and Applications | 2019年 / 31卷
关键词
Assembly line balancing; Parallel stations; Simulated annealing; Multiple-operator assignments; Feasible neighborhood generation;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we present a practical line balancing problem: multiple-operator assembly line balancing problem II. The formulation of the proposed problem is novel in terms of investigating the operator assignment from a different perspective. In order to solve this problem, we develop a simulated annealing (SA)-based two-stage solution procedure, where a new neighborhood generation and a search method are designed and demonstrated to be more efficient than the traditional neighborhood search method. In theory, we prove the original neighborhood generation method is not efficient than the proposed one. Computational experiments on some benchmark cases have been conducted to validate the efficiency of the proposed algorithm compared to the traditional SA approach. Our work also has some practical merits. In the managerial situation, a factory may have already recruited some workers that cannot be dismissed. Our problem describes that the production manager allocates different number of workers to the workstations to minimize the cycle time.
引用
收藏
页码:347 / 357
页数:10
相关论文
共 45 条
[1]  
Battaïa O(2013)A taxonomy of line balancing problems and their solution approaches Int J Prod Econ 142 259-277
[2]  
Dolgui A(2003)Placement by thermodynamic simulated annealing Phys Lett A 317 415-423
[3]  
De Vicente J(2018)Optimal workforce assignment to operations of a paced assembly line Eur J Oper Res 264 200-211
[4]  
Lanchares J(2014)Balancing and sequencing of stochastic mixedmodel assembly U-lines to minimise the expectation of work overload time Int J Prod Res 52 7529-7548
[5]  
Hermida R(2011)A GA-based approach for optimizing single-part flow-line configurations of RMS J Intell Manuf 22 301-317
[6]  
Dolgui A(2012)A reactive GRASP and path relinking for balancing reconfigurable transfer lines Int J Prod Res 50 5213-5238
[7]  
Kovalev S(2012)A genetic algorithm based approach for simultaneously balancing and sequencing of mixed-model U-lines with parallel workstations and zoning constraints Comput Ind Eng 62 206-215
[8]  
Kovalyov MY(2013)A simulated annealing algorithm based approach for balancing and sequencing of mixed-model U-lines Comput Ind Eng 66 1070-1084
[9]  
Malyutin S(2012)An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations Comput Oper Res 39 3344-3360
[10]  
Soukhal A(2015)A priority rule-based constructive heuristic and an improvement method for balancing assembly lines with parallel multi-manned workstations Int J Prod Res 53 736-756