摘要
Heijunka is a key-element of the Toyota production system which levels the release of production kanbans in order to achieve an even production flow over all possible types of products, thus, e.g. reducing the bullwhip effect. In this paper we analyze a kanban controlled and heijunka leveled production system where the arriving demands are controlled and limited by a kanban loop. The production system is modeled as a queueing network with synchronization stations. The aim is to determine the optimal number of production kanbans, and thus the buffer size that guarantees a given service level.
引用
收藏
页码:49 / 60
页数:11
相关论文
共 59 条
[1]  
Akturk M. S.(1999)An overview of design and operational issues of kanban systems International Journal of Production Research 37 3859-3881
[2]  
Erhun F.(1991)Determining the number of kanbans in a multiproduct, multistage production system International Journal of Production Research 29 881-895
[3]  
Bard J. F.(1992)A review of the kanban production control research literature Production and Operations Management 1 393-411
[4]  
Golany B.(1987)A mathematical programming approach to a deterministic kanban system Management Science 33 427-441
[5]  
Berkley B. J.(2004)Unified framework for describing and comparing the dynamics of pull control policies Annals of Operation Research, Special Issue on Stochastic Models of Production-Inventory Systems 125 21-45
[6]  
Bitran G. R.(1989)Queueing models of kanban and MRP controlled manufacturing systems Engineering Cost and Production Economics 17 3-20
[7]  
Chang L.(2000)Extended kanban control system: Combining kanban and base stock IIE Transactions on Design and Manufacturing 32 369-386
[8]  
Bollon J. M.(1987)Configuring a kanban system using a discrete optimization of multiple stochastic responses International Journal of Production Research 25 721-740
[9]  
Di Mascolo M.(1997)Evaluation of the role of waste in a truck manufacturing line using simulation Journal of Intelligent Manufacturing 8 449-458
[10]  
Frein Y.(1996)An analytical method for performance evaluation of kanban controlled production systems Operations Research 44 50-64