An improved MIP-based approach for a multi-skill workforce scheduling problem

被引:0
作者
Murat Fırat
C. A. J. Hurkens
机构
[1] TU Eindhoven,Department of Mathematics and Computer Science
来源
Journal of Scheduling | 2012年 / 15卷
关键词
Project scheduling; Multi-skill workforce scheduling; Mixed integer programming;
D O I
暂无
中图分类号
学科分类号
摘要
This paper deals with scheduling complex tasks with an inhomogeneous set of resources. The problem is to assign technicians to tasks with multi-level skill requirements. Here, the requirements are merely the presence of a set of technicians that possess the necessary capabilities. An additional complication is that a set of combined technicians stays together for the duration of a work day. This typically applies to scheduling of maintenance and installation operations. We build schedules by repeated application of a flexible matching model that selects tasks to be processed and forms groups of technicians assigned to combinations of tasks. The underlying mixed integer programming (MIP) model is capable of revising technician-task allocations and performs very well, especially in the case of rare skills.
引用
收藏
页码:363 / 380
页数:17
相关论文
共 45 条
  • [1] Avramidis N. A.(2010)Optimizing daily agent scheduling in a multi-skill call center European Journal of Operational Research 200 822-832
  • [2] Chan W.(1996)A decision aid for the selection and scheduling of software maintenance projects IEEE Transactions on Systems Man and Cybernetics Part A Systems and Humans 26 203-212
  • [3] Gendreau M.(2007)A branch-and-bound method for solving multi-skill project scheduling problem RAIRO Operations Research 41 155-170
  • [4] L’Ecuyer P.(1999)Resource-constrained project scheduling: notation, classification, models, and methods European Journal of Operational Research 112 3-41
  • [5] Pisacane O.(2000)A genetic algorithm for scheduling staff of mixed skills under multi-criteria European Journal of Operational Research 125 359-369
  • [6] Ballou D.(2010)Scheduling technicians and tasks in a telecommunication company Journal of Scheduling 13 393-409
  • [7] Tayi G.(1999)The multi-mode resource-constrained project scheduling problem with generalized precedence relations European Journal of Operational Research 119 538-556
  • [8] Bellenguez M. O.(2008)A project scheduling problem with labour constraints and time-dependent activities requirements International Journal of Production Economics 112 217-225
  • [9] Neron E.(2008)Competence-driven project portfolio selection, scheduling and staff assignment Central European Journal of Operations Research 16 281-306
  • [10] Brucker P.(2010)A survey of variants and extensions of the resource-constrained project scheduling problem Central European Journal of Operations Research 207 1-14