A mixed (continuous + discrete) time-cost trade-off model considering four different relationships with lag time

被引:0
|
作者
Jaeho Son
TaeHoon Hong
Sangyoub Lee
机构
[1] Hongik University,School of Architectural Engineering
[2] Yonsei University,Dept. of Architectural Engineering
[3] Konkuk University,Dept. of Real Estate Studies
来源
KSCE Journal of Civil Engineering | 2013年 / 17卷
关键词
Time-Cost Trade-Off; critical path method; optimization models; linear programming; integer programming; costs;
D O I
暂无
中图分类号
学科分类号
摘要
Numerous Time-Cost Trade-Off (TCTO) models have been developed to identify the best combination of time and cost in a critical path network. Although there are four relationships in the critical path network, most of the models developed so far have considered only the Finish-Start (F-S) relationship. Thus, an advanced TCTO model that considers all four relationships between activities was developed in this study to accurately present a project, and is presented in this paper. The model also takes into account the lag time between activities. Previous TCTO models minimize the total project cost based on the given crash scenario. Moreover, to enhance the practicality, the model was developed to work with various TCTO scenarios such as continuous, discrete, and even mixed (continuous + discrete). The combined scenario reflects the most realistic situation. Two independent scenarios cannot be combined without mathematical modifications since a rudimentary mixing of two scenarios may provide an incorrect solution. A new formulation technique is introduced to merge the two independent scenarios mathematically and it guarantees the optimal solution.
引用
收藏
页码:281 / 291
页数:10
相关论文
共 50 条
  • [21] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
    Geem, Zong Woo
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716
  • [22] Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time-Cost Trade-Off Problem
    Sonmez, Rifat
    Iranagh, Mahdi Abbasi
    Uysal, Furkan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (03)
  • [23] Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem
    Anagnostopoulos, K. P.
    Kotsikas, L.
    APPLIED MATHEMATICS AND COMPUTATION, 2010, 217 (01) : 260 - 270
  • [24] Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) : 685 - 697
  • [26] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS
    Benjaoran, Vacharapoom
    Sae-Tae, Numpheungk
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
  • [27] Modeling Time-Cost Trade-off Problem with Fuzzy Activity Duration Times
    Ma, Weimin
    Ke, Hua
    FOURTH INTERNATIONAL CONFERENCE ON COOPERATION AND PROMOTION OF INFORMATION RESOURCES IN SCIENCE AND TECHNOLOGY (COINFO 2009), 2009, : 344 - 347
  • [28] Research on the fully fuzzy time-cost trade-off based on genetic algorithms
    Jin Chao-guang
    Jl Zhuo-shang
    Lin Yan
    Zhao Yuan-min
    Huang Zhen-dong
    JOURNAL OF MARINE SCIENCE AND APPLICATION, 2005, 4 (03) : 18 - 23
  • [29] Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
    Ammar, Mohammad A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (01): : 65 - 71
  • [30] Research on the fully fuzzy time-cost trade-off based on genetic algorithms
    Jin Chao-guang
    Ji Zhuo-shang
    Lin Yan
    Zhao Yuan-min
    Huang Zhen-dong
    Journal of Marine Science and Application, 2005, 4 (3) : 18 - 23