An economic evaluation model for concession on convention infrastructure projects in Greece

被引:3
|
作者
Evangelos K. Christakos
Glikeria Kalfakakou
机构
[1] A.U.TH.,Department of Civil Engineer
关键词
Project management; Concession Projects; Investment; Viability; IRR;
D O I
10.1007/BF02941191
中图分类号
学科分类号
摘要
Scientific management of projects constitutes an area of expertise in the field of engineering that requires a combination of various skills from different scientific sectors in order for it to get efficient and complete. The need for construction of numerous and large scale transport infrastructure projects in later years led the engineering sector, and primarily major construction corporations, as well as the public sector to carry out viability and evaluation studies for all major transportation infrastructure investment. This need was amplified when numerous infrastructure projects previously funded exclusively by the public sector and European Union’s grants started to get funded by the private sector and constructed with the concession-on-convention method. The present essay intends to develop a mathematical model for retrieving the economic and technical parameters that are involved in such a concession-on-convention project and especially for the examination of its viability and its return-on-equity.
引用
收藏
页码:147 / 164
页数:17
相关论文
共 50 条
  • [21] VIP - Tender Model for Infrastructure Projects
    VIP - Vergabemodell für Infrastrukturprojekte
    Eder, M. (manfred.eder@laabmayr.at), 1600, Ernst und Sohn (05):
  • [22] Circular Economy 4.0 Evaluation Model for Urban Road Infrastructure Projects, CIROAD
    Pinones, Pablo
    Derpich, Ivan
    Venegas, Ricardo
    SUSTAINABILITY, 2023, 15 (04)
  • [23] ECONOMIC EVALUATION OF IRBESARTAN IN GREECE
    Maniadakis, N.
    Fragoulakis, V
    Papagiannopoulou, V
    Yfantopoulos, I
    VALUE IN HEALTH, 2008, 11 (06) : A405 - A406
  • [24] Health economic evaluation in Greece
    Rovithis, Dimitrios
    INTERNATIONAL JOURNAL OF TECHNOLOGY ASSESSMENT IN HEALTH CARE, 2006, 22 (03) : 388 - 395
  • [25] Concession decision model of BOT projects based on a real options approach
    Yang Wei-hua
    Dai Da-shuang
    PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 307 - 312
  • [26] MODELLING OF ECONOMIC RISK AND UNCERTAINTY IN LARGE INFRASTRUCTURE PROJECTS
    Schjaer-Jacobsen, Hans
    COMPUTATIONAL INTELLIGENCE IN BUSINESS AND ECONOMICS, 2010, 3 : 473 - 480
  • [27] Generalized Economic Modeling for Infrastructure and Capital Investment Projects
    Aziz, Ahmed M. Abdel
    Russell, Alan D.
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2006, 12 (01) : 18 - 32
  • [28] Economic impact assessment of mega infrastructure pipeline projects
    Dimitriou, Dimitrios J.
    Mourmouris, John C.
    Sartzetaki, Maria F.
    APPLIED ECONOMICS, 2015, 47 (40) : 4310 - 4322
  • [29] IMPACT OF NEW APPROACHES ON THE DEVELOPMENT OF ECONOMIC EVALUATION METHODOLOGY FOR TRANSPORT INFRASTRUCTURE PROJECTS IN THE CZECH REPUBLIC
    Hromadka, Vit
    Vitkova, Eva
    Varbuchta, Petr
    Kovarova, Hana
    Labudek, Lukas
    Hola, Michaela
    PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON TRAFFIC AND TRANSPORT ENGINEERING (ICTTE), 2016, : 861 - 867
  • [30] Decision modes for flexible concession term in public infrastructure BOT projects-A multi-case study on foreign typical projects
    Song, Jinbo
    Dang, Wei
    Sun, Yan
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2013, 46 (04): : 142 - 150