Two-agent scheduling problem under fuzzy environment

被引:0
作者
Yaodong Ni
Zhaojun Zhao
机构
[1] University of International Business and Economics,School of Information Technology and Management
来源
Journal of Intelligent Manufacturing | 2017年 / 28卷
关键词
Two-agent scheduling; Credibility measure; Fuzzy programming; Hybrid intelligent algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
The two-agent scheduling problem has a wide range of applications in real world. Although uncertainty is ubiquitous in real world, research of the two-agent scheduling problem under uncertain environment is rare. For applications where historical data is not abundant, investigation of this problem under fuzzy environment is necessary. This paper studies the two-agent scheduling problem under fuzzy environment. We assume that the processing time of each job and the weights that the agents assign to the jobs are fuzzy variables, and focus on the problem where the cost of one agent is the maximum weighted completion time of her jobs and the cost of the other agent is the sum of the weighted completion time of her jobs. Based on three different decision criteria, we present three concepts of schedule and three fuzzy programming models respectively. In order to solve the proposed models, we design a hybrid intelligent algorithm that integrates fuzzy simulation with genetic algorithm. Numerical experiments are given to show the effectiveness of the models and the algorithm.
引用
收藏
页码:739 / 748
页数:9
相关论文
共 100 条
  • [1] Agnetis A(2004)Scheduling problems with two competing agents Operations Research 52 229-242
  • [2] Mirchandani PB(2009)A Lagrangian approach to single-machine scheduling problems with two competing agents Journal of Scheduling 12 401-415
  • [3] Pacciarelli D(2003)A multiple-criterion model for machine scheduling Journal of Scheduling 6 7-16
  • [4] Pacifici A(1959)Chance-constrained programming Management Science 6 73-79
  • [5] Agnetis A(2013)Liu process and uncertain calculus Journal of Uncertainty Analysis and Applications 1 1-12
  • [6] Pascale G(2011)A two-agent single-machine scheduling problem with truncated sum-of-processing-times-based learning considerations Computers & Industrial Engineering 60 534-541
  • [7] Pacciarelli D(2006)Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs Theoretical Computer Science 362 273-281
  • [8] Baker KR(2008)Multi-agent scheduling on a single machine with max-form criteria European Journal of Operational Research 188 603-609
  • [9] Smith JC(2011)Two-agent scheduling with position-based deteriorating jobs and learning effects Applied Mathematics and Computation 217 8804-8824
  • [10] Charnes A(2014)Two-agent scheduling on uniform parallel machines with min–max criteria Annals Of Operations Research 213 79-94