共 135 条
[1]
Harris F(1913)How many parts to make at once, factory Mag. Manag. 10 135-136
[2]
Silver EA(1969)A simple modification of the EOQ for the case of a varying demand rate Prod. Invent. Manag. 10 52-65
[3]
Meal HC(1973)A heuristic for selecting lot size quantities for the case of a deterministic time varying demand rate and discrete opportunities for replenishment Prod. Invent. Manag. 14 64-74
[4]
Silver EA(1991)An EOQ model for deteriorating items with a linear trend in demand J. Oper. Res. Soc. 42 1105-1110
[5]
Meal HC(1997)An EOQ model for deteriorating items with a linear trend in demand and shortages in all cycles Int. J. Prod. Econ. 49 205-213
[6]
Goswami A(1998)A heuristic for replenishment of deteriorating items with time varying demand and shortages in all cycles Int. J. Syst. Sci. 29 551-555
[7]
Chaudhuri KS(2000)A note on lot-sizing heuristic for deteriorating items with time varying demands and shortages Comput. Oper. Res. 27 495-505
[8]
Chakrabarti T(2001)Deterministic inventory model with two-levels of storage, a linear trend in demand and a fixed time horizon Comput. Oper. Res. 28 1315-1331
[9]
Chaudhuri KS(2003)A note on an order level inventory model for a deteriorating items with time dependent quadratic demand Comput. Oper. Res. 30 1901-1916
[10]
Chakrabarti T(2004)An order-level Inventory model for a deteriorating items with Weibull distribution deterioration, time-quadratic demand and shortages Adv. Model. Optim. 6 21-35