Application of chance-constrained programming for stochastic group shop scheduling problem

被引:3
作者
Fardin Ahmadizar
Mehdi Ghazanfari
Seyyed Mohammad Taghi Fatemi Ghomi
机构
[1] Iran University of Science and Technology,Department of Industrial Engineering
[2] Amirkabir University of Technology,Department of Industrial Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2009年 / 42卷
关键词
Group shops scheduling; Uncertain release dates and processing times; Total weighted completion time; Chance-constrained programming; Ant colony algorithm; Heuristic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we study a group shop scheduling (GSS) problem subject to uncertain release dates and processing times. The GSS problem is a general formulation including the other shop scheduling problems such as the flow shop, the job shop, and the open shop scheduling problems. The objective is to find a job schedule which minimizes the total weighted completion time. We solve this problem based on the chance-constrained programming. First, the problem is formulated in a form of stochastic programming and then prepared in a form of deterministic mixed binary integer linear programming such that it can be solved by a linear programming solver. To solve the problem efficiently, we develop an efficient hybrid method. Exploiting a heuristic algorithm in order to satisfy the constraints, an ant colony optimization algorithm is applied to construct high-quality solutions to the problem. The proposed approach is tested on instances where the random variables are normally, uniformly, or exponentially distributed.
引用
收藏
页码:321 / 334
页数:13
相关论文
共 50 条
  • [1] Application of chance-constrained programming for stochastic group shop scheduling problem
    Ahmadizar, Fardin
    Ghazanfari, Mehdi
    Ghomi, Seyyed Mohammad Taghi Fatemi
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (3-4) : 321 - 334
  • [2] Chance-constrained model for uncertain job shop scheduling problem
    Jiayu Shen
    Yuanguo Zhu
    Soft Computing, 2016, 20 : 2383 - 2391
  • [3] Chance-constrained model for uncertain job shop scheduling problem
    Shen, Jiayu
    Zhu, Yuanguo
    SOFT COMPUTING, 2016, 20 (06) : 2383 - 2391
  • [4] Gamma distribution approach in chance-constrained stochastic programming model
    Kumru D Atalay
    Aysen Apaydin
    Journal of Inequalities and Applications, 2011
  • [5] Gamma distribution approach in chance-constrained stochastic programming model
    Atalay, Kumru D.
    Apaydin, Aysen
    JOURNAL OF INEQUALITIES AND APPLICATIONS, 2011,
  • [6] Distributional Assumptions in Chance-Constrained Programming Models of Stochastic Water Pollution
    Kataria, Mitesh
    Elofsson, Katarina
    Hasler, Berit
    ENVIRONMENTAL MODELING & ASSESSMENT, 2010, 15 (04) : 273 - 281
  • [7] Distributional Assumptions in Chance-Constrained Programming Models of Stochastic Water Pollution
    Mitesh Kataria
    Katarina Elofsson
    Berit Hasler
    Environmental Modeling & Assessment, 2010, 15 : 273 - 281
  • [8] Stochastic vendor selection problem: chance-constrained model and genetic algorithms
    Shiwei He
    Sohail S. Chaudhry
    Zhonglin Lei
    Wang Baohua
    Annals of Operations Research, 2009, 168
  • [9] Stochastic vendor selection problem: chance-constrained model and genetic algorithms
    He, Shiwei
    Chaudhry, Sohail S.
    Lei, Zhonglin
    Wang Baohua
    ANNALS OF OPERATIONS RESEARCH, 2009, 168 (01) : 169 - 179
  • [10] Two-stage interval stochastic chance-constrained robust programming and its application in flood management
    Ding, Xiaowen
    Hua, Dongxu
    Jiang, Guihong
    Bao, Zhengfeng
    Yu, Lei
    JOURNAL OF CLEANER PRODUCTION, 2017, 167 : 908 - 918