Decision support for spare parts acquisition in post product life cycle

被引:0
作者
Karl Inderfurth
Kampan Mukherjee
机构
[1] Otto-von-Guericke-University Magdeburg,Faculty of Economics and Management
[2] Indian School of Mines,Department of Management Studies
来源
Central European Journal of Operations Research | 2008年 / 16卷
关键词
Decision tree; Dynamic programming; Remanufacturing; Spare parts management;
D O I
暂无
中图分类号
学科分类号
摘要
A major task in service management is the timely and cost efficient provision of spare parts for durable products. This especially holds good, when the regular production of the product, its components and parts has been discontinued, but customer service still has to be guaranteed for quite a long time. In such post product life cycle period, three options are available to organize the spare parts acquisition, namely (i) setting up a single large order within the final lot of regular production, (ii) performing extra production runs until the end of service and (iii) using remanufacturing to gain spare parts from used products. These three options are characterized by different cost and flexibility properties. Due to the time-variability and uncertainty of demands for spare parts and also that of the returns of used products, it is a challenging task to find out the optimal combination of these three options. In this paper we show how this problem can be modeled and solved by Decision Tree and stochastic Dynamic Programming procedure. Based on the Dynamic Programming approach a heuristic method is proposed, which can be employed to come up with a simple solution procedure for real-world spare parts acquisition problems during the post product life cycle. A numerical example is presented to demonstrate the application of the solution methods described in the paper.
引用
收藏
页码:17 / 42
页数:25
相关论文
共 47 条
  • [1] Alden JM(1992)Rolling horizon procedures in nonhomogeneous Markov decision processes Oper Res 40 183-194
  • [2] Smith RL(1996)Joint optimization of maintenance and inventory policies for a single system IIE Trans 28 415-424
  • [3] Armstrong M(1985)Maintenance resource planning—an integrative approach Eng Costs Product Econ 9 147-154
  • [4] Atkins D(2003)Good buy? Delay in end-of-life purchases Eur J Oper Res 146 216-228
  • [5] Bruggeman W(1994)Base stock level determination for higher cost low demand critical repairable spares Comput Oper Res 21 411-420
  • [6] van Dierdouck R(1997)Models for multi-echelon repairable item inventory systems with limited repair capacity Eur J Oper Res 97 480-492
  • [7] Cattani KD(2001)Issues in end-of-life product recovery and reverse logistics Prod Plan Control 12 534-547
  • [8] Souza GC(2003)Integrating closed-loop supply chains and spare parts management at IBM Interfaces 33(November–December) 6 44-56
  • [9] Dhakar T(1980)The all-time requirement of spare parts for service after sales—theoretical analysis and practical results Int J Oper Prod Manag 1 59-69
  • [10] Schmidt C(1998)Issues in the automotive parts remanufacturing industry: a discussion of results from surveys performed among remanufacturers Eng Des Autom 4 27-46