Manufacturing intelligence to forecast and reduce semiconductor cycle time

被引:0
|
作者
Chen-Fu Chien
Chia-Yu Hsu
Chih-Wei Hsiao
机构
[1] National Tsing Hua University,Department of Industrial Engineering and Engineering Management
[2] Yuan Ze University,Department of Information Management
来源
Journal of Intelligent Manufacturing | 2012年 / 23卷
关键词
Cycle time; Work in process (WIP); Manufacturing intelligence; Gauss-Newton regression; Back-propagation neural network; Semiconductor;
D O I
暂无
中图分类号
学科分类号
摘要
Semiconductor manufacturing is one of the most complicated production processes with the challenges of dynamic job arrival, job re-circulation, shifting bottlenecks, and lengthy fabrication process. Owing to the lengthy wafer fabrication process, work in process (WIP) usually affects the cycle time and throughput in the semiconductor fabrication. As the applications of semiconductor have reached the era of consumer electronics, time to market has played an increasingly critical role in maintaining a competitive advantage for a semiconductor company. Many past studies have explored how to reduce the time of scheduling and dispatching in the production cycle. Focusing on real settings, this study aims to develop a manufacturing intelligence approach by integrating Gauss-Newton regression method and back-propagation neural network as basic model to forecast the cycle time of the production line, where WIP, capacity, utilization, average layers, and throughput are rendered as input factors for indentifying effective rules to control the levels of the corresponding factors as well as reduce the cycle time. Additionally, it develops an adaptive model for rapid response to change of production line status. To evaluate the validity of this approach, we conducted an empirical study on the demand change and production dynamics in a semiconductor foundry in Hsinchu Science Park. The approach proved to be successful in improving forecast accuracy and realigning the desired levels of throughput in production lines to reduce the cycle time.
引用
收藏
页码:2281 / 2294
页数:13
相关论文
共 50 条
  • [41] Manufacturing Intelligence to Forecast the Customer Order Behavior for Vendor Managed Inventory
    Department of Industrial Engineering and Engineering Management, National Tsing Hua University, 30013, Hsinchu, Taiwan
    不详
    Smart Innov. Syst. Technol., 2012, (51-60):
  • [42] Manufacturing Intelligence to Forecast the Customer Order Behavior for Vendor Managed Inventory
    Chien, Chen-Fu
    Hsu, Chia-Yu
    Lin, Sheng-Chiao
    INTELLIGENT DECISION TECHNOLOGIES (IDT'2012), VOL 2, 2012, 16 : 51 - 60
  • [43] Managing product-inherent constraints with artificial intelligence: production control for time constraints in semiconductor manufacturing
    May, Marvin Carl
    Oberst, Jan
    Lanza, Gisela
    JOURNAL OF INTELLIGENT MANUFACTURING, 2024, 35 (08) : 4259 - 4276
  • [44] Semiconductor fault detection and classification for yield enhancement and manufacturing intelligence
    Chien, Chen-Fu
    Hsu, Chia-Yu
    Chen, Pei-Nong
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (03) : 367 - 388
  • [45] Manufacturing intelligence for Hsinchu Science Park semiconductor sales prediction
    Chien, Chen-Fu
    Lin, Kuo-Yi
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2012, 29 (02) : 98 - 110
  • [46] Semiconductor fault detection and classification for yield enhancement and manufacturing intelligence
    Chen-Fu Chien
    Chia-Yu Hsu
    Pei-Nong Chen
    Flexible Services and Manufacturing Journal, 2013, 25 : 367 - 388
  • [47] Computational Intelligence Techniques to Fault Detection in the Semiconductor Manufacturing Process
    Kerdprasop, Kittisak
    Kerdprasop, Nittaya
    ADVANCES IN MECHANICAL ENGINEERING, PTS 1-3, 2011, 52-54 : 1171 - 1176
  • [48] REDUCE PROJECT-CYCLE TIME
    BARLOG, R
    GINN, D
    CHEMICAL ENGINEERING, 1994, 101 (07) : 133 - +
  • [49] Book publishers reduce cycle time
    IPA Bull., 2006, 4 (28-31):
  • [50] Inspection innovations to reduce cycle time
    SMT, United States
    SMT Surf Mount Technol Mag, 10 (70-73):