Developing a new multi-criteria decision-making for flood prioritization of sub-watersheds using concept of D numbers

被引:0
作者
Mehdi Sepehri
Nguyen Thi Thuy Linh
Hadi Nazri Pouya
Reza Bahramloo
Jalal Sadeghian
Bagher Ghermezcheshme
Ali Talebi
Hamidreza Peyrovan
Phong Nguyen Thanh
机构
[1] Yazd University,Department of Watershed Management, Faculty of Natural Resources
[2] University of Silesia in Katowice,Faculty of Natural Sciences, Institute of Earth Sciences
[3] AREEO,Watershed Research Department. Hamedan Agricultural and Natural Resources Research and Education Center
[4] AREEO,Agricultural Engineering Research Department. Hamedan Agricultural and Natural Resources Research and Education Center
[5] Bu-Ali Sina University,Department of Civil Engineering, Faculty of Engineering
[6] Agricultural Research,Hydrology and Water Resources Development Department, Soil Conservation and Watershed Management Institute
[7] Education and Extension Organization (AREEO),Laboratory of Environmental Sciences and Climate Change, Institute for Computational Science and Artificial Intelligence
[8] Van Lang University,Faculty of Environment, School of Technology
[9] Van Lang University,undefined
来源
Acta Geophysica | 2024年 / 72卷
关键词
AHP; Iran; Natural hazards; Picture fuzzy; Uncertainty;
D O I
暂无
中图分类号
学科分类号
摘要
Floods are one of the most dangerous natural disasters that humanity has ever faced. In this study, a modified version of D number technique as a suitable form of multi-criteria decision-making (MCDM) approaches was proposed to prioritize flooding in the Sad-Kalan watershed of Iran using some flood related criteria. The proposed method can overcome some shortcomings and uncertainties of the existing MCDM methods. In order to evaluate the performance of the method regarding flood prioritization, its results were compared with the analytic hierarchy process (AHP) technique as mostly frequently used MCDM method. The findings demonstrate that the modified version of D number method provides better results than AHP method. In spite of inherent advantages of D number method, the advantages of the proposed method in relation to existing MCDM are as follows: 1- considering the local and global importance of used criteria, 2- reducing the uncertainty in decision makers’ judgments using employing the concept of Picture fuzzy-AHP, 3- considering the degree of consistency in evaluation of decision makers into calculations. Furthermore, the method is flexible and can be used in any region of the world.
引用
收藏
页码:2027 / 2039
页数:12
相关论文
共 197 条
[1]  
Ahmadisharaf E(2016)Spatial probabilistic multi-criteria decision making for assessment of flood management alternatives J Hydrol 533 365-378
[2]  
Kalyanapu AJ(2020)Flash flood potential prioritization of sub-basins in an ungauged basin in Turkey using traditional multi-criteria decision-making methods Soft Comput 24 14251-14263
[3]  
Chung E-S(2021)Identification of the groundwater potential recharge zones using MCDM models: full consistency method (FUCOM), best worst method (BWM) and analytic hierarchy process (AHP) Water Resour Manag 35 4727-4745
[4]  
Akay H(2021)Geomorphic analysis, morphometric-based prioritization and tectonic implications in Chite Lui river, Northeast India J Geol Soc India 97 385-395
[5]  
Baduna Koçyiğit M(2015)A review and classification of approaches for dealing with uncertainty in multi-criteria decision analysis for healthcare decisions Pharmacoeconomics 33 445-455
[6]  
Akbari M(2015)Comparison of different multi criteria decision-making models in prioritizing flood management alternatives Water Resour Manag 29 2503-2525
[7]  
Meshram SG(2020)GIS-based multidimensional decision model for enhancing flood risk prioritization in urban areas Int J Disaster Risk Reduct 48 101582-2428
[8]  
Krishna R(2012)D numbers: theory and applications J Inf Comput Sci 9 2421-98
[9]  
Pradhan B(2021)Stakeholder perceptions in flood risk assessment: a hybrid fuzzy AHP-TOPSIS approach for Istanbul, Turkey Int J Disaster Risk Reduct 60 102327-13
[10]  
Shadeed S(2021)Flash flood hazard assessment and prioritization of sub-watersheds in Heliopolis basin, East Cairo, Egypt Arab J Geosci 14 1693-31