共 126 条
[1]
Pappu A(2007)Solid wastes generation in India and their recycling potential in building materials Build Environ 42 2311-2320
[2]
Saxena M(2006)Attitudes and perceptions of construction workforce on construction waste in Sri Lanka Manag Environ Qual Int J 17 57-72
[3]
Asolekar SR(2015)A field based methodology for estimating waste generation rates at various stages of construction projects Resour Conserv Recycl 100 70-80
[4]
Kulatunga U(2007)Implementation of waste management and minimisation in the construction industry of Malaysia Resour Conserv Recycl 51 190-202
[5]
Amaratunga D(2010)Sustainable construction: construction and demolition waste reconsidered Waste Manag Res 28 118-129
[6]
Haigh R(2013)A SWOT analysis of successful construction waste management J Clean Prod 39 1-8
[7]
Rameezdeen R(2014)Measuring the impact of prefabrication on construction waste reduction: an empirical study in China Resour Conserv Recycl 91 27-39
[8]
Bakshan A(2014)Strategies and measures for implementing eco-labelling schemes in Singapore’s construction industry Resour Conserv Recycl 89 31-40
[9]
Srour I(2015)Improving waste management in construction projects: an Australian study Resour Conserv Recycl 101 73-83
[10]
Chehab G(2004)Towards a closed-loop materials economy Chin J Popul Resour Environ 2 9-12