共 138 条
[11]
Meyarivan T(1976)The complexity of flowshop and jobshop scheduling Mathematics of operations research 2 117-129
[12]
Ding J-Y(2010)Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time Annals of Operations Research 180 165-196
[13]
Song S(2010)Variable neighbourhood search: methods and applications Annals of Operations Research 175 367-407
[14]
Wu C(2019)Quality evaluation of solution sets in multiobjective optimisation: a survey ACM Computing Surveys 52 26-1944
[15]
Fernandez-Viagas V(2019)An effective hybrid genetic algorithm and variable neighborhood search for integrated process planning and scheduling in a packaging machine workshop IEEE Transactions on Systems, Man, and Cybernetics: Systems 49 1933-5409
[16]
Framinan J(2018)An effective multiobjective algorithm for energy-efficient scheduling in a real-life welding shop IEEE Transactions on Industrial Informatics 14 5400-19
[17]
Fernandez-Viagas V(2019)Mathematical modeling and a discrete artificial bee colony algorithm for the welding shop scheduling problem Memetic Computing 11 1-5038
[18]
Perez-Gonzalez P(2013)Minimising makespan in distributed permutation flowshops using a modified iterated greedy algorithm International Journal of Production Research 51 5029-238
[19]
Framinan JM(2017)Energy-efficient permutation flow shop scheduling problem using a hybrid multi-objective backtracking search algorithm Journal of Cleaner Production 144 228-79
[20]
Fu Y(2017)A hybrid multi-objective grey wolf optimizer for dynamic scheduling in a real-world welding industry Engineering Applications of Artificial Intelligence 57 61-787