共 104 条
[1]
Al-Fawzan MA(2005)A bi-objective model for robust resource-constrained project scheduling International Journal of Production Economics 96 175-187
[2]
Haouari M(2009)Effectiveness of resource buffers for the stochastic task insertion problem Journal of Management & Engineering Integration 2 14-85
[3]
Archer S(2012)An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations European Journal of Operational Research 219 73-659
[4]
Armacost RL(2014)Solving resource-constrained construction scheduling problems with overlaps by metaheuristic Journal of Civil Engineering and Management 20 649-194
[5]
Pet-Armacost J(2016)A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags Algorithms 9 63-333
[6]
Bianco L(2008)A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling Computers & Industrial Engineering 55 183-210
[7]
Caramia M(2013)Participatory project management for improved disaster resilience International Journal of Disaster Resilience in the Built Environment 4 317-197
[8]
Bożejko W(2019)Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem Annals of Operations Research 274 187-622
[9]
Hejducki Z(2002)A fast and elitist multiobjective genetic algorithm: NSGA-II IEEE Transactions on Evolutionary Computation 6 182-439
[10]
Uchroński M(2015)Robust execution strategies for project scheduling with unreliable resources and stochastic durations Journal of Scheduling 18 607-578