Considering the conveyer stoppages in sequencing mixed-model assembly lines by a new fuzzy programming approach

被引:0
作者
Masoud Rabbani
Farzad Radmehr
Neda Manavizadeh
机构
[1] University of Tehran,College of Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2011年 / 54卷
关键词
Mixed-model assembly lines; Conveyer stoppages; Sub lines; Multi-objective sequencing problems; Fuzzy goal programming;
D O I
暂无
中图分类号
学科分类号
摘要
Mixed-model production is the practice of assembling different and distinct models in a line without changeovers with responding to sudden demand changes for a variety of models. In this paper, we specify sequence of models to minimize conveyer stoppages. We assume that our lines are fixed and we cannot change the balance of the lines. When the condition of lines like setup cost and demand of each model change, it is important to specify the sequence for minimizing the conveyer stoppages without balancing the line again because the main lines are fixed. We consider three objective functions simultaneously: minimizing the variation in the actual and required production capacity of the line and minimizing the objectives which increase the chance of conveyer stoppage, including: (a) minimizing the total setup time, (b) minimizing the total production variation cost, and (c) minimizing the total utility work cost. Because of conflicting objectives, we propose the fuzzy goal programming-based approach to solve the model. Finally, we present an estimator for nearness of conveyer stoppages and study about affecting of sub-lines and changing the conveyer velocity in a station for reducing stoppages.
引用
收藏
页码:775 / 788
页数:13
相关论文
共 124 条
[1]  
Mirzapour Al-e-Hashem SMJ(2009)An efficient method to solve a mixed-model assembly line sequencing problem considering a sub-line World Appl Sci J 6 168-181
[2]  
Aryanezhad MB(1999)A note on Toyota’s goal of sequencing mixed models on an assembly line Comput Ind Eng 36 57-65
[3]  
Xiaobo Z(1991)Sequencing to minimize work overload in assembly lines with product options Manage Sci 37 572-586
[4]  
Zhou Z(1996)Heuristics and exact algorithms for solving the Monden problem Eur J Opl Res 88 101-113
[5]  
Asres A(1996)Sequencing mixed-model assembly lines with genetic algorithms Comput Ind Eng 30 1027-1036
[6]  
Yano CA(1989)Scheduling mixed-model multi-level just-in-time production systems Int J Prod Res 27 487-509
[7]  
Rachamadugu R(2007)Sequencing mixed-model assembly lines: survey, classification and model critique Eur J Oper Res 192 349-373
[8]  
Bautista J(2003)Theory and methodology. Bicriteria sequencing method for the mixed-model assembly line in just-in-time production systems Eur J Oper Res 131 188-207
[9]  
Companys R(1998)Pattern based vocabulary building for effectively sequencing mixed-model assembly lines Journal of Heuristics 4 359-381
[10]  
Corominas A(2009)A two-phase linear programming methodology for fuzzy multi-objective mixed-model assembly line problem Int J Adv Manuf Technol 44 1010-1023