Longest path time-cost analysis of construction projects with generalised activity constraints

被引:0
作者
Athanasios P. Chassiakos
机构
[1] University of Patras,Department of Civil Engineering
关键词
Time-cost trade-off; project planning; project scheduling; project crashing; integer programming; optimisation;
D O I
10.1007/BF02941256
中图分类号
学科分类号
摘要
Time-cost analysis is an important element of project scheduling, especially for lengthy and costly construction projects, as it evaluates alternative schedules and establishes an optimum one considering any project completion deadline. Existing methods for time-cost analysis have not adequately considered typical activity and project characteristics, such as generalised precedence relationships between activities and external time constraints, that would provide a more realistic representation of actual construction projects. The present work aims to incorporate such characteristics in the analysis and proposes a method for developing optimal project time-cost curves based on critical path analysis. In this method, the project is described through a matrix where all paths are tabulated with respect to activities. The project matrix includes values of 1, 0, or −1 depending on the type of precedence relation between an activity and its adjacent ones within a path. Integer programming is employed to choose among all activity crashing alternatives those which reduce path durations to a desired project length value with the lowest possible crashing cost. The method has been successfully tested on a number of cases and results are presented to illustrate its application and demonstrate its merits.
引用
收藏
相关论文
共 37 条
  • [1] Chassiakos A.P.(2000)An Integer Programming Method for CPM Time-Cost Analysis Computer Modeling in Engineering and Sciences 1 9-18
  • [2] Samaras C.(1984)Optimal Probabilistic Compression of PERT Networks Journal of Construction Engineering and Management, ASCE 110 437-446
  • [3] Theodorakopoulos D.(1995)The discrete time-cost tradeoff problem revisited European Journal of Operational Research 81 225-238
  • [4] Coskunoglu O.(1992)The analysis of activity networks under generalized precedence relations Management Science 38 1245-1263
  • [5] De P.(1997)Using genetic algorithms to solve construction time-cost trade-off problems Journal of Computing in Civil Engineering, ASCE 11 184-189
  • [6] Dunne E.J.(2000)Stochastic construction time-cost tradeoff analysis Journal of Computing in Civil Engineering 14 117-126
  • [7] Ghosh J.B.(2001)Probabilistic optimal-cost scheduling Journal of Construction Engineering and Management 127 431-437
  • [8] Wells C.E.(2003)Activity time-cost tradeoffs under time and cost chance constraints Computers and Industrial Engineering 44 365-384
  • [9] Elmaghraby S.E.(1999)GA-based multicriteria optimal model for construction scheduling Journal of Construction Engineering and Management, ASCE 125 420-427
  • [10] Kamburowski J.(1999)Using machine learning and genetic algorithms to solve time-cost trade-off problems (MLGAS) Journal of Construction Engineering and Management 125 347-353