共 51 条
[1]
Katrin D(2020)Mixed integer programming for dynamic tower crane and storage area optimization on construction sites Autom. Constr. 120 103259-360
[2]
Katrin J(2018)Tower cranes layout planning using agent-based simulation considering activity conflicts Autom. Constr. 93 348-338
[3]
Clemens T(2021)The traveling salesman puts-on a hard hat—Tower crane scheduling in construction projects Eur. J. Oper. Res. 292 327-827
[4]
André B(2020)Covering polygons with discs: The problem of crane selection and location on construction sites Omega 97 102114-10
[5]
Ahmed Y(2019)Robust disturbance rejection based control with extended-state resonant observer for sway reduction in uncertain tower-cranes Int. J. Autom. Comput. 16 812-387
[6]
Mohamed M(2020)Robust integral sliding mode control of tower cranes J. Vib. Control 27 9-107
[7]
Hussein T(2021)Hybrid data-driven fuzzy active disturbance rejection control for tower crane systems Eur. J. Control 58 373-6
[8]
Bacel M(2020)Optimization of crane mechanisms to reduce vibration Autom. Constr. 119 103335-38
[9]
Farook H(2021)Control of an underactuated double-pendulum overhead crane using improved model reference command shaping: Design, simulation and experiment Mech. Syst. Signal Process. 151 107358-36
[10]
Dirk B(2020)Adaptive tracking controller design for double-pendulum tower cranes Mech. Mach. Theory 153 103980-23