A robust multi-objective optimization model for project scheduling considering risk and sustainable development criteria

被引:0
|
作者
Majid Askarifard
Hamidreza Abbasianjahromi
Mehran Sepehri
Ehsanollah Zeighami
机构
[1] Islamic Azad University,Department of Civil Engineering, Arak Branch
[2] K. N. Toosi University of Technology,Department of Civil Engineering
[3] Sharif University of Technology,Ģraduate School of Management
来源
Environment, Development and Sustainability | 2021年 / 23卷
关键词
Project programming; Sustainable development criteria; Robust programming; Multi-objective mathematical model; Response surface methodology;
D O I
暂无
中图分类号
学科分类号
摘要
There is limited research that considers the sustainability aspect of the projects’ schedule. The present study proposes a model to cover this gap by considering sustainable development criteria. A multi-objective model with four objective functions, including minimizing cost, risk, and socio-environmental impacts, has been presented to decrease the project’s delay. Since some of the parameters are considered under conditions of uncertainty for the proximity of problems to real projects, the robust programming method is used to deal with the uncertainty, and the epsilon-constraint method was applied to solve the multi-objective model. Several scenarios are also defined to analyze the sensitivity of robust parameters in the generation of Pareto-based solutions, and the obtained results are also investigated. In addition, the design of experiments is applied for response surface methodology to determine the optimal levels of robust parameters that can generate solutions with greater variety. A real case study has been developed to implement different steps of the proposed model. Since the outcomes of the model determine the duration of each activity according to the objectives and different levels of robust parameters, managers and project owners can use this model as a tool to make appropriate decisions for their projects’ schedules.
引用
收藏
页码:11494 / 11524
页数:30
相关论文
共 50 条
  • [1] A robust multi-objective optimization model for project scheduling considering risk and sustainable development criteria
    Askarifard, Majid
    Abbasianjahromi, Hamidreza
    Sepehri, Mehran
    Zeighami, Ehsanollah
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2021, 23 (08) : 11494 - 11524
  • [2] Multi-objective optimization model for multi-project scheduling on critical chain
    Wang Wei-xin
    Wang Xu
    Ge Xian-long
    Deng Lei
    ADVANCES IN ENGINEERING SOFTWARE, 2014, 68 : 33 - 39
  • [3] A MULTI-OBJECTIVE SCHEDULING OPTIMIZATION MODEL CONSIDERING PRODUCT BLOCKAGE AND MACHINE FAULTS
    Yin, H. Y.
    Liu, L. Z.
    Yeh, J. S.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2017, 16 (03) : 506 - 516
  • [4] A Multi-Objective Mathematical Programming Model for Project-Scheduling Optimization Considering Customer Satisfaction in Construction Projects
    Zohrehvandi, Mehrnoosh
    Zohrehvandi, Shakib
    Khalilzadeh, Mohammad
    Amiri, Maghsoud
    Jolai, Fariborz
    Zavadskas, Edmundas Kazimieras
    Antucheviciene, Jurgita
    MATHEMATICS, 2024, 12 (02)
  • [5] A Multi-objective Model for Multi-skill Project Scheduling Problem considering Perform Efficiency
    Zhu, Chong
    Xue, Yuan
    He, Zhijie
    Bao, Zhenqiang
    Zhang, Zhaoyue
    Hu, Kaixuan
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 719 - 724
  • [6] A multi-objective optimization approach to project scheduling with resiliency criteria under uncertain activity duration
    Farnaz Torabi Yeganeh
    Seyed Hessameddin Zegordi
    Annals of Operations Research, 2020, 285 : 161 - 196
  • [7] A two-stage sustainable uncertain multi-objective portfolio selection and scheduling considering conflicting criteria
    Ramedani, Amir Mohammad
    Mehrabian, Ahmad
    Didehkhani, Hosein
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 132
  • [8] A multi-objective optimization approach to project scheduling with resiliency criteria under uncertain activity duration
    Torabi Yeganeh, Farnaz
    Zegordi, Seyed Hessameddin
    ANNALS OF OPERATIONS RESEARCH, 2020, 285 (1-2) : 161 - 196
  • [9] A MULTI-OBJECTIVE LOT-STREAMING OPTIMIZATION SCHEDULING MODEL CONSIDERING THE BLOCKING EFFECT
    Li, Y. G.
    Zhang, M. S.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2017, 16 (04) : 731 - 741
  • [10] Robust multi-objective optimization for energy production scheduling in microgrids
    Wang, Luhao
    Li, Qiqiang
    Zhang, Bingying
    Ding, Ran
    Sun, Mingshun
    ENGINEERING OPTIMIZATION, 2019, 51 (02) : 332 - 351