共 80 条
[11]
Chaudhuri D(2000)No-wait and separate setup three-machine flow shop with total completion time criterion Int Trans Oper Res 7 245-264
[12]
Fink A(2001)Minimizing total completion time in no-wait flow shop with sequence dependent additive changeover times J Oper Res Soc 52 449-462
[13]
Voβ S(1983)Heuristic algorithm for the m-machine, n-job flow shop sequencing problem Omega 11 91-95
[14]
Aldowaisan T(2007)On the NEH heuristic for minimizing the makespan in permutation flow shop Omega 35 53-60
[15]
Aldowaisan T(2000)Heuristic algorithm for scheduling in the no-wait flow shop J Mater Process Technol 107 459-465
[16]
Allahverdi A(2003)An effective hybrid heuristic for flow shop scheduling Int J Adv Manuf Technol 21 38-44
[17]
Aldowaisan T(2011)Discrete harmony search algorithm for the no-wait flow shop scheduling problem with total flow time criterion Int J Adv Manf Technol 56 683-692
[18]
Allahverdi A(2009)A heuristic to minimize total flow time in permutation flow shop Omega 37 734-739
[19]
Allahverdi A(2003)An efficient constructive heuristic for flowtime minimization in permutation flow shop Omega 31 311-317
[20]
Aldowaisan T(2009)New heuristics for no-wait flow shops with a liner combination of makespan and maximum lateness Int J Prod Res 47 5717-5738