Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization

被引:0
作者
Kaizhou Gao
Quanke Pan
P. N. Suganthan
Junqing Li
机构
[1] Liaocheng University,College of Computer Science
[2] Nanyang Technology University,School of Electrical and Electronic Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2013年 / 66卷
关键词
Flow shop scheduling; No-wait; Total flow time; Constructive heuristics; Composite heuristics;
D O I
暂无
中图分类号
学科分类号
摘要
The no-wait flow shop scheduling problem with total flow time criterion has important applications in industrial systems. Heuristics that explore specific characteristics of the problem are essential to find good solutions in limited computational time for many practical applications. This paper first presents two constructive heuristics, namely improved standard deviation heuristic (ISDH) and improved Bertolissi heuristic (IBH), by combining the standard deviation heuristic (Gao et al., Int J Adv Manf Technol 56:683–692, 2011) and Bertolliso heuristic (Bertolissi, J Mater Process Technol 107:459–465, 2000) with the procedure of the constructive heuristic of Laha (Int J Adv Manf Technol 41:97–109, 2009). Then, four composite heuristics, i.e., ISDH with local search, IBH with local search, ISDH with iteration, and IBH with iteration, are separately proposed using the insertion-based local search method and iteration operator to improve the solutions of the ISDH and IBH. Extensive computational experiments are carried out based on a set of well-known flow shop benchmark instances that are considered as no-wait flow shop instances. Computational results and comparisons show that the proposed composite heuristics perform significantly better than the existing ones, and the proposed composite heuristics further improve the presented constructive heuristics for the no-wait flow shop scheduling problem with total flow time criterion.
引用
收藏
页码:1563 / 1572
页数:9
相关论文
共 80 条
[11]  
Chaudhuri D(2000)No-wait and separate setup three-machine flow shop with total completion time criterion Int Trans Oper Res 7 245-264
[12]  
Fink A(2001)Minimizing total completion time in no-wait flow shop with sequence dependent additive changeover times J Oper Res Soc 52 449-462
[13]  
Voβ S(1983)Heuristic algorithm for the m-machine, n-job flow shop sequencing problem Omega 11 91-95
[14]  
Aldowaisan T(2007)On the NEH heuristic for minimizing the makespan in permutation flow shop Omega 35 53-60
[15]  
Aldowaisan T(2000)Heuristic algorithm for scheduling in the no-wait flow shop J Mater Process Technol 107 459-465
[16]  
Allahverdi A(2003)An effective hybrid heuristic for flow shop scheduling Int J Adv Manuf Technol 21 38-44
[17]  
Aldowaisan T(2011)Discrete harmony search algorithm for the no-wait flow shop scheduling problem with total flow time criterion Int J Adv Manf Technol 56 683-692
[18]  
Allahverdi A(2009)A heuristic to minimize total flow time in permutation flow shop Omega 37 734-739
[19]  
Allahverdi A(2003)An efficient constructive heuristic for flowtime minimization in permutation flow shop Omega 31 311-317
[20]  
Aldowaisan T(2009)New heuristics for no-wait flow shops with a liner combination of makespan and maximum lateness Int J Prod Res 47 5717-5738