Monitoring of the Alamillo cable-stayed bridge during construction

被引:0
作者
J. R. Casas
A. C. Aparicio
机构
[1] Technical University of Catalunya,School of Civil Engineering
来源
Experimental Mechanics | 1998年 / 38卷
关键词
Cable-stayed bridge; bridge monitoring; segmental construction; instrumentation; model updating; vibration testing;
D O I
暂无
中图分类号
学科分类号
摘要
The Alamillo Bridge is one of the long-span bridges crossing the Guadalquivir River. It was built on the occasion of Expo '92 in 1992 in Sevilla, Spain. The bridge is a cable-stayed structure spanning 200 m without any intermediate supports. Its originality is the lack of back stays and the balancing of the front stays through the backward inclination of a massive pylon. This paper shows the importance of experimental in situ techniques when applied to unconventional civil engineering structures and how—with the help of an important amount of accurate instrumentation, monitoring the most important experimental variables—it was possible to build the bridge correctly, safely, and on schedule.
引用
收藏
页码:24 / 28
页数:4
相关论文
共 2 条
[1]  
Casas J.R.(1995)Full-scale Dynamic Testing of the Alamillo Cable-stayed Bridge in Sevilla (Spain) Earthquake Eng. Struct. Dyn. 24 35-51
[2]  
Casas J.R.(1994)A Combined Method for Measuring Cable Forces: The Cable-stayed Alamillo Bridge, Spain Struct. Eng. Int. 4 235-240