共 79 条
[1]
Aust J(2020)A systematic methodology for developing Bow-tie in risk assessment: application to borescope inspection Aerospace 7 86-260
[2]
Pons D(2013)Environmental risk source management system for the petrochemical industry J Process Saf Environ Prot 92 251-54
[3]
Chen QQ(2018)Environmental risk management associated with the development one of oil fields in southwestern Iran using AHP and FMEA methods J Anthropog Pollut 2 41-1107
[4]
Jia Q(2020)Environmental risk assessment of dams at constructional phase using VIKOR and EFMEA methods (case study: Balarood Dam, Iran) Hum Ecol Risk Assess Int J 26 1087-22
[5]
Yuan Z(2020)Identifying hazards and presenting HSE risk management program using Bow-tie and SOWT-ANP methods at the urea unit of Shiraz petrochemical complex J Saf Health Work 10 18-56
[6]
Huang L(2020)Environmental risk assessment of gas wells drilling effluents: integration of environmental failure mode and effects analysis and analytic network process models J Health Sci 8 49-63
[7]
Cheraghi M(2006)Managing industrial risk having a tasted and proven system to prevent and assess risk hazardous material J Hazard Mater 130 58-1066
[8]
Karbassi A(2012)Assessment model for equipment risk management: petrochemical industry cases J Saf Sci 50 1056-3204
[9]
Monavari SM(2021)Development of a framework for dynamic risk assessment of environmental impacts in chemicals warehouse using CFD-BN Int J Environ Sci Technol 18 3189-88
[10]
Baghvand A(2019)Environmental risk assessment of ilam petrochemical company using analytical network analysis and the technique for order of preference by similarity to ideal solution methods in 2016 J Ilam Univ Med Sci 26 79-371