共 73 条
[1]
Jin G(2003)A new framework for MRP systems to be effective in engineered-to-order environments Robotics and Computer Integrated Manufacturing 19 533-541
[2]
Thomson V(2002)Karmarkar’s and interaction/prediction algorithms for hierarchical production planning for the highest business benefit Computers in Industry 49 141-155
[3]
Yan HS(1991)Production planning in stochastic demand environments Mathl Comput Modeling 15 10 91-95
[4]
Zhang XD(2003)Advanced resource planning Robotics and Computer Integrated Manufacturing 19 211-218
[5]
Ma XD(2003)Comparison of OR and AI methods in discrete manufacturing using fuzzy logic Journal of Intelligent Manufacturing 15 517-526
[6]
Feiring B(1999)A hybrid intelligent inference model for computer aided process planning Integrated Manufacturing Systems 10 343-353
[7]
Vandaele N(2002)An intelligent sales forecasting system through integration of artifical neural networks and fuzzy neural networks with fuzzy weight elimination Neural Networks 15 909-925
[8]
de Boeck L(2003)Dynamic scheduling of flexible manufacturing systems using neural networks and inductive learning Integrated Manufacturing Systems 14 160-168
[9]
Kubat C(2005)Modeling of modularity and scaling for integration of customer in design of engineer-to-order products Computer-Aided Design 37 149-172
[10]
Taskin H(2006)Integrating data mining and rough set for customer group-based discovery of product configuration rules International Journal of Production Research 44 2789-2811