Factors influencing Time and Cost Overruns on Freeform Construction Projects

被引:0
作者
Andrew Kavuma
Jongho Ock
Hyounseung Jang
机构
[1] Seoul National University of Science and Technology,School of Architecture
来源
KSCE Journal of Civil Engineering | 2019年 / 23卷
关键词
time overruns; cost overruns; freeform projects; Building Information Modeling (BIM); latent factors;
D O I
暂无
中图分类号
学科分类号
摘要
Freeform buildings differ from conventional buildings in a way that they have irregularly shaped facades. Oftentimes, freeform projects run behind schedule and over the budget. This study aimed at exploring factors that influence time and cost overruns on freeform buildings. The study employed questionnaire surveys to collect data from experts with freeform project experience, and the responses were analyzed using R statistical program. The study used exploratory factor analysis to identify the most critical latent factors to freeform project success. The study found factors related to application of Building Information Modeling (BIM) and fabrication of freeform components as very crucial to timely completion, whereas factors related to personnel involved as essential to completing within budget. Additionally, the study summarized time overrun variables into three latent factors; uniqueness, capabilities and practices of the parties involved, and level of preparation for the project. The cost overrun latent factors were: cost uncertainty, client decisions, extent of preparation, and delay. Understanding the causes of time and cost overruns on freeform buildings identified in this study can help clients make informed decisions regarding undertaking freeform projects as well as help consultants and contractors minimize the risk of encountering such overruns.
引用
收藏
页码:1442 / 1450
页数:8
相关论文
共 50 条
[31]   Causes of construction cost and time overruns: The 2010 FIFA World Cup stadia in South Africa [J].
Baloyi, Lucius ;
Bekker, Michiel .
ACTA STRUCTILIA, 2011, 18 (01) :51-67
[32]   Public Sector Corruption and Accountability in Cost Deviations and Overruns of Public Projects [J].
Catalao, Francisco Pinheiro ;
Cruz, Carlos Oliveira ;
Sarmento, Joaquim Miranda .
PUBLIC ORGANIZATION REVIEW, 2023, 23 (03) :1105-1126
[33]   Public Sector Corruption and Accountability in Cost Deviations and Overruns of Public Projects [J].
Francisco Pinheiro Catalão ;
Carlos Oliveira Cruz ;
Joaquim Miranda Sarmento .
Public Organization Review, 2023, 23 :1105-1126
[34]   Structuring risks for a comprehensive understanding of cost overruns in power plant projects [J].
Islam, Muhammad Saiful ;
Nepal, Madhav ;
Skitmore, Martin .
CONSTRUCTION INNOVATION-ENGLAND, 2025, 25 (03) :1014-1032
[35]   The determinants of cost deviations and overruns in transport projects, an endogenous models approach [J].
Catalao, Francisco Pinheiro ;
Cruz, Carlos Oliveira ;
Sarmento, Joaquim Miranda .
TRANSPORT POLICY, 2019, 74 :224-238
[36]   Root-Cause Analysis of Construction-Cost Overruns [J].
Rosenfeld, Yehiel .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (01)
[37]   Different cost performance: different determinants? The case of cost overruns in Dutch transport infrastructure projects [J].
Cantarelli, C. C. ;
van Wee, B. ;
Molin, E. J. E. ;
Flyvbjerg, B. .
TRANSPORT POLICY, 2012, 22 :88-95
[38]   Evaluation and prediction of time overruns in Jordanian construction projects using coral reefs optimization and deep learning methods [J].
Shihadeh J. ;
Al-Shaibie G. ;
Bisharah M. ;
Alshami D. ;
Alkhadrawi S. ;
Al-Bdour H. .
Asian Journal of Civil Engineering, 2024, 25 (3) :2665-2677
[39]   Risk factors causing cost overruns in road networks [J].
Ammar, Taher ;
Abdel-Monem, Mohamed ;
El-Dash, Karim .
AIN SHAMS ENGINEERING JOURNAL, 2022, 13 (05)
[40]   Influence of Technical Reasons on Cost Overruns of Infrastructural Projects: A Sustainable Development Perspective [J].
Lovrincevic, Marijo ;
Vukomanovic, Mladen ;
Peric, Romano .
SUSTAINABILITY, 2024, 16 (21)