Factors influencing Time and Cost Overruns on Freeform Construction Projects

被引:0
作者
Andrew Kavuma
Jongho Ock
Hyounseung Jang
机构
[1] Seoul National University of Science and Technology,School of Architecture
来源
KSCE Journal of Civil Engineering | 2019年 / 23卷
关键词
time overruns; cost overruns; freeform projects; Building Information Modeling (BIM); latent factors;
D O I
暂无
中图分类号
学科分类号
摘要
Freeform buildings differ from conventional buildings in a way that they have irregularly shaped facades. Oftentimes, freeform projects run behind schedule and over the budget. This study aimed at exploring factors that influence time and cost overruns on freeform buildings. The study employed questionnaire surveys to collect data from experts with freeform project experience, and the responses were analyzed using R statistical program. The study used exploratory factor analysis to identify the most critical latent factors to freeform project success. The study found factors related to application of Building Information Modeling (BIM) and fabrication of freeform components as very crucial to timely completion, whereas factors related to personnel involved as essential to completing within budget. Additionally, the study summarized time overrun variables into three latent factors; uniqueness, capabilities and practices of the parties involved, and level of preparation for the project. The cost overrun latent factors were: cost uncertainty, client decisions, extent of preparation, and delay. Understanding the causes of time and cost overruns on freeform buildings identified in this study can help clients make informed decisions regarding undertaking freeform projects as well as help consultants and contractors minimize the risk of encountering such overruns.
引用
收藏
页码:1442 / 1450
页数:8
相关论文
共 50 条
[21]   The Determinants of Time Overruns in Portuguese Public Projects [J].
Catalao, Francisco Pinheiro ;
Cruz, Carlos Oliveira ;
Sarmento, Joaquim Miranda .
JOURNAL OF INFRASTRUCTURE SYSTEMS, 2021, 27 (02)
[22]   Exogenous determinants of cost deviations and overruns in local infrastructure projects [J].
Catalao, Francisco Pinheiro ;
Cruz, Carlos Oliveira ;
Sarmento, Joaquim Miranda .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2019, 37 (12) :697-711
[23]   Cost Overruns in US Rail Transit Projects: A Statistical Analysis [J].
Gao, Nan ;
Touran, Ali .
CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, :593-601
[24]   THE COST PERFORMANCE AND CAUSES OF OVERRUNS IN INFRASTRUCTURE DEVELOPMENT PROJECTS IN ASIA [J].
Andric, Jelena M. ;
Mahamadu, Abdul-Majeed ;
Wang, Jiayuan ;
Zou, Patrick X. W. ;
Zhong, Ruoyu .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (03) :203-214
[25]   Determining Cost and Causes of Overruns in Infrastructure Projects in South Asia [J].
Andric, Jelena M. ;
Lin, Shuangyu ;
Cheng, Yuan ;
Sun, Bin .
SUSTAINABILITY, 2024, 16 (24)
[26]   Rethinking construction cost overruns: cognition, learning and estimation [J].
Ahiaga-Dagbui, Dominic ;
Smith, Simon .
JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2014, 19 (01) :38-+
[27]   Factors causing cost overruns in public hospital construction in developing countries: a case from Vietnam [J].
Huynh, Nhat Minh ;
Le, Anh Tuan ;
Le-Hoai, Long ;
Nguyen, Huu Tho .
JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2025, 24 (03) :1716-1730
[28]   Policies to Avoid Cost Overruns in Infrastructure Projects: Critical Evaluation and Recommendations [J].
Lind, Hans ;
Brunes, Fredrik .
CONSTRUCTION ECONOMICS AND BUILDING, 2014, 14 (03) :74-85
[29]   Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden [J].
Lind, Hans ;
Brunes, Fredrik .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2015, 33 (07) :554-568
[30]   Ranking and comparing key factors causing time-overruns in on-site construction [J].
Lindhard, Soren M. ;
Neve, Hasse ;
Kalsaas, Bo Terje ;
Moller, Dan Eggert ;
Wandahl, Soren .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (14) :2724-2730