共 50 条
- [4] MATHEMATICAL AND STATISTICAL DESCRIPTION OF THE START-UP RELIABILITY AND START-UP COSTS FOR CONVENTIONAL POWER-STATION EQUIPMENT ENERGIETECHNIK, 1981, 31 (11): : 408 - 412
- [5] OPTIMIZING THE START-UP OF DUO BOILER POWER-STATION EQUIPMENT TAKING THE PROBABILITY OF START-UP SUCCESS INTO ACCOUNT ENERGIETECHNIK, 1984, 34 (02): : 52 - 55
- [9] Effects of dispense equipment sequence on process start-up defects ADVANCES IN RESIST MATERIALS AND PROCESSING TECHNOLOGY XXX, 2013, 8682
- [10] Protection Configuration for the Start-up Testing of Series Transformer in UPFC PROCEEDINGS OF 2017 CHINA INTERNATIONAL ELECTRICAL AND ENERGY CONFERENCE (CIEEC 2017), 2017, : 184 - 189