Risk sharing for PPP project in construction waste recycling industry in China

被引:0
|
作者
Jingkuang Liu
Zhaowen Hua
Yongshi Pang
Xuetong Wang
机构
[1] Guangzhou University,Department of Construction Management, School of Management
关键词
PPP (public–private partnership); Construction Waste recycling; Risk; System dynamics;
D O I
暂无
中图分类号
学科分类号
摘要
With the deepening urbanization, urban renewal, and reconstruction movement in China, a large amount of construction waste has been generated. In order to ease the financial pressure on the government to deal with construction waste, introducing the PPP model in the construction waste recycling industry has become popular. Based on the theory of system dynamics, this paper studies the risks of using the PPP model in construction waste recycling industry. First, a causal loop diagram was depicted according to the interaction of the main risk factors. Then, using the system dynamics software Vensim, a dynamic model of the risks of the PPP project was constructed. The results show the following: (1) the PPP project in the construction waste recycling industry is profitable; (2) For the PPP project in the construction waste recycling industry, the tendering risk will break out in 6~7 years, the greatest impact on tendering risk is the cooperation environment risk, where cooperation environment risk entropy is increased by 50% and tendering risk entropy is increased by 53.66%; (3) Construction risks will break out in 7~8 years. The construction cost, construction delay, and design defects have the greatest impact on construction risks, where entropy is increased by 50% and construction risk entropy is increased by 19.30%, 19.25%, and 19.08%, respectively; (4) The operational risk has not broken out in 10 years and is expected to break out in 10 to 20 years. Raw material power supply, production technology level, and operations management efficiency have the greatest impact on operational risk, where entropy is increased by 50% and operational risk entropy is increased by 21.52%, 20.84%, and 20.76%, respectively. These results can provide suggestions and references for the risk management of PPP projects in China’s construction waste recycling industry.
引用
收藏
页码:12614 / 12628
页数:14
相关论文
共 50 条
  • [31] The Risk of PPP Project and Demand for Lawyers from the Perspective of China
    Wei, Lei
    Chen, Zhaohui
    Proceedings of the 2016 2nd International Conference on Economics, Management Engineering and Education Technology (ICEMEET 2016), 2016, 87 : 1077 - 1080
  • [32] The Risk Evaluation of Beautiful Village Construction Project Based on PPP Mode
    Wu, Chunhong
    Fang, Jun
    Wang, Chao
    ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 119 - 130
  • [33] Risk Sharing Research of Construction Project Based on Entropy Weight
    Zhang Yi
    Wang Zhuo-fu
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT SCIENCE AND INFORMATION SYSTEM, VOLS 1-4, 2009, : 689 - 691
  • [34] Analysis of the barriers of sustainable e-waste recycling industry in China
    Ren, J.
    Tan, S.
    Dong, L.
    WASTE MANAGEMENT, 2015, 44 : I - II
  • [35] Promoting construction and demolition waste recycling by using incentive policies in China
    Hua, Chunxiang
    Liu, Chenyu
    Chen, Jianguo
    Yang, Chenxi
    Chen, Linyan
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (35) : 53844 - 53859
  • [36] ECO-EFFICIENCY OF CONSTRUCTION AND DEMOLITION WASTE RECYCLING IN CHONGQING, CHINA
    Wu, Jiangbo
    Hu, Mingming
    Shi, Shiying
    Liu, Tingting
    Zhang, Chunbo
    EXPANDING BOUNDARIES: SYSTEMS THINKING IN THE BUILT ENVIRONMENT, 2016, : 398 - 403
  • [37] German textile waste recycling industry processing and its implications in China
    Liu Guangfu
    Yi Tian
    MATERIAL SCIENCE, CIVIL ENGINEERING AND ARCHITECTURE SCIENCE, MECHANICAL ENGINEERING AND MANUFACTURING TECHNOLOGY II, 2014, 651-653 : 1345 - 1348
  • [38] ASSESSMENT OF RISK FACTORS AND PROJECT SUCCESS IN CONSTRUCTION INDUSTRY
    Imran, Muhammad
    Hye, A. K. Mahbubul
    Urbanski, Mariusz
    Dacko-Pikiewicz, Zdzislawa
    TRANSFORMATIONS IN BUSINESS & ECONOMICS, 2022, 21 (2B): : 986 - 1000
  • [39] Implementation Status and Countermeasures of Urban Domestic Waste Treatment PPP Project in China
    Zhang, Benyue
    Gao, Mingyang
    Sun, Jingjing
    EKOLOJI, 2019, 28 (107): : 427 - 431
  • [40] Qualitative Risk Assessments in Project Management in Construction Industry
    Burkov, Vladimir
    Burkova, Irina
    Barkhi, Reza
    Berlinov, Mikhail
    VI INTERNATIONAL SCIENTIFIC CONFERENCE INTEGRATION, PARTNERSHIP AND INNOVATION IN CONSTRUCTION SCIENCE AND EDUCATION (IPICSE-2018), 2018, 251