共 61 条
[1]
Ahadzie D. K.(2008)A model for predicting the performance of project managers at the construction phase of mass house building projects ASCE J. Constr. Eng. Manage. 134 618-629
[2]
Proverbs D. G.(1996)Modeling project performance for decision making ASCE J. Constr.Eng. Manage. 122 265-273
[3]
Olomolaiye P. O.(1986)Engineering productivity management and performance measurement ASCE J. Manage. Engr. 2 141-147
[4]
Alarcon L. F.(2004)Performance measurement in construction ASCE J. Manage. Engr. 20 42-50
[5]
Ashley D. B.(2006)Characteristics for leveraging value management processes on capital facility projects ASCE Journal of Mgmt. Engr. 22 135-147
[6]
Armentrout D. R.(2011)Predicting project cost performance level by assessing risk factors of building construction Journal of Asian Architecture and Building Engineering 10 437-444
[7]
Bassioni H. A.(2011)Quantitative approach for project performance measurement on building construction in South Korea KSCE Journal of Civil Engineering 15 1319-1328
[8]
Price A. D. F.(2009)Measuring performance of the Malaysian construction industry Constr. Manage. Econ. 27 1231-1244
[9]
Hassan T. M.(2010)A Study of project characteristics and project performance level of difficulty KICEM Journal of Construction Engineering & Management 11 78-88
[10]
Cha H. S.(2016)Developing a cost normalization framework for phase-based performance assessment of construction projects Canadian Journal of Civil Engineering 43 1075-1086