Design and Part Load Performance Simulation of Natural Gas Combined Cycle with New Operating Regulation for Gas Turbine

被引:0
作者
Lalatendu Pattanayak
Biranchi Narayana Padhi
机构
[1] International Institute of Information Technology,Department of Mechanical Engineering
来源
Arabian Journal for Science and Engineering | 2022年 / 47卷
关键词
Gas turbine; Part load; Regulation strategy; Simulation; System integration;
D O I
暂无
中图分类号
学科分类号
摘要
The design and part load performance simulation of a natural gas combined cycle power plant (CCPP) is of great importance and is affected by various load regulation strategies during operation. In this work, a new regulation strategy with inlet air cooling (IAC) system integration is proposed for CCPP load regulation and performance assessment. The regulation strategy uses an IAC system and gas turbine inlet temperature (TIT/T4) named as IAC-T4, which is little different from the concept of inlet air heating (IAH) regulation. The analysis is performed using a simulation program and compared with inlet guide vane (IGV-T4) regulation to predict the behaviour of CCPP during part load operation. The result shows that the IAC-T4 regulation strategy reasonably enhance the part load performance. The efficiency increment is in the range of 0.25–1.02% with variation of load from 80 to 100%. The drop-in fuel consumption rate varies 0.53–2.02% for load reduction from 80 to 50%. The variation of topping cycle exergy efficiency for both the regulation strategies is between 7.9 and 8.2% under full load and part load. Whereas for both the control strategy the bottoming cycle efficiency variation was found to be 36.11–37.15% with a steam temperature limit of 564 °C. Moreover, it is observed that the topping cycle exerts a substantial impact in the CCPP performance for the IAC-T4 regulation strategy compared with IGV-T4 regulation strategy. The heat recovery steam generator (HRSG) exergy efficiency variation for both the strategy is relatively small, as the heat exergy of GT exhaust recovered effectively for all load cases. In conclusion, this study attempts a new approach for CCPP load regulation and part load thermal performance enhancement using IAC system integration.
引用
收藏
页码:16289 / 16303
页数:14
相关论文
共 126 条
[1]  
Carapellucci R(2021)Regenerative gas turbines and steam injection for repowering combined cycle power plants: design and part-load performance Energy Convers. Manage. 9 371-386
[2]  
Giordano L(2015)Performance analysis of combined cycle power plant Front. Energy 125 1478-1489
[3]  
Dev N(2019)Thermodynamic study of different configurations of gas-stem combined cycle employing intercooling and different means of cooling in topping cycle Appl. Therm. Eng. 43 1323-1337
[4]  
Attri R(2017)Multi-objective optimization of IGV position in a heavy-duty gas turbine on part-load performance Appl. Therm. Eng. 30 2545-2554
[5]  
Maheshwari M(2021)Multi-objective optimization analysis on gas-steam combined cycle system with exergy theory J. Clean. Prod. 118 119-141
[6]  
Singh O(2021)An automated strategy for gas turbines off-design predictions with a CFD-based throughflow method Appl. Therm. Eng. 79 459-474
[7]  
Mehrpanahi A(2002)Analytical solutions and typical characteristics of part-load performances of single shaft gas turbine and its cogeneration Energy Convers. Manage. 126 76-88
[8]  
Payganeh GH(2010)Mathematical modeling and simulation of a cogeneration plant Appl. Therm. Eng. 145 823-838
[9]  
Gu H(2020)Off-design performance of gas turbine power units with alternative load-control strategies Energy Eng. 72 574-589
[10]  
Cui X(2017)The optimum performance of the combined cycle power plant: a comprehensive review Renew. Sustain. Energy Rev. 29 71-85