Adaptability Study of EPB Shield Machine in Clay Stratum in Xuzhou

被引:0
作者
Shuguang Song
Ruizhong Tian
Liping Li
Jie Hu
Chunsheng Shen
Shaozhong Peng
机构
[1] Shandong Jianzhu University,School of Transportation Engineering
[2] China Railway 12 Bureau Group Co.,School of Qilu Transportation
[3] Ltd,undefined
[4] Shandong University,undefined
来源
Geotechnical and Geological Engineering | 2019年 / 37卷
关键词
Shield; Clay stratum; Expansive soil; Adaptability;
D O I
暂无
中图分类号
学科分类号
摘要
The shield crosses the expansive clay stratum, which is easy to cause damage to the side wall retaining structure of the tunnel, and it is easy to paste the cutter head during the tunneling, which makes the cutter tool unable to cut the soil normally. In order to study the adaptability of soil pressure balance shield in expansive clay stratum, based on the first phase project of Xuzhou metro urban rail transit line 2, the targeted design of the shield selection and the selection of excavation parameters are proposed. The torque design meets the requirements of stratum excavation and the optimum tunneling speed is 30–50 mm/min. The relevant conclusions can provide a more comprehensive reference for shield construction under similar formation conditions in the future.
引用
收藏
页码:2335 / 2341
页数:6
相关论文
共 9 条
  • [1] Chen J(2018)Research on tool selection and normal pressure tool change technology for large diameter shield cutter Tunn Constr 38 110-117
  • [2] Cheng C(2016)Study on the adaptability of earth pressure shield in old clay formation in Wuhan Constr Technol 45 105-115
  • [3] Cheng C(2017)Research on adaptability of slurry shield in rich water sand and cobble ground in shenyang Chin J Undergr Space Eng 13 190-196
  • [4] Ding Z(2002)Shield selection and shield improvement in Guangzhou metro tunnel construction Chin J Rock Mech Eng 21 1820-1823
  • [5] Feng H(2018)Summary of academic research on road construction machinery in China 2018 Chin J Highw 31 1-164
  • [6] Guo C(2016)Analysis of difficulties and shield adaptability of nanchang subway line 2 tunnel construction Constr Technol 45 98-103
  • [7] Hou K(2014)Research on shield selection of large-grained large-grained pebbled pumice stratum Mod Tunn Technol 51 13-17
  • [8] Wang H(2017)Shield selection design and adaptability analysis of nanning metro line 2 Tunn Constr 37 1037-1045
  • [9] Wang G(2010)Selection of opening ratio of earth pressure balance shield cutter and its adaptability to stratum China Civ Eng J 3 88-92