共 8 条
[1]
Lazarev AA(2006)The pareto-optimal set of the NP-hard problem of minimization of the maximum lateness for a single machine J. Comput. Syst. Sci. Int. M. SP MAIK Nauka/Interperiodica 45 943-949
[2]
Kravchenko SA(2011)Parallel machine problems with equal processing times J. Sched. 14 435-444
[3]
Werner F(1981)Scheduling unit-time tasks with arbitrary release times and deadlines SIAM J. Comput. 10 256-269
[4]
Garey MR(1998)An outer approximation algorithm for generating all efficient extreme points in the outcome set of a multiple objective linear programming problem J. Glob. Optim. 13 1-24
[5]
Johnson DS(undefined)undefined undefined undefined undefined-undefined
[6]
Simons BB(undefined)undefined undefined undefined undefined-undefined
[7]
Tarjan RE(undefined)undefined undefined undefined undefined-undefined
[8]
Benson HP(undefined)undefined undefined undefined undefined-undefined