A hybrid evolutionary algorithm for the resource-constrained project scheduling problem

被引:4
|
作者
Thammano A. [1 ]
Phu-ang A. [1 ]
机构
[1] Computational Intelligence Laboratory, Faculty of Information Technology, King Mongkut's Institute of Technology Ladkrabang
关键词
Evolutionary algorithm; Metaheuristic; Resource-constrained project scheduling problem;
D O I
10.1007/s10015-012-0065-x
中图分类号
学科分类号
摘要
The resource-constrained project scheduling problem (RCPSP) is an NP-hard optimization problem. RCPSP is one of the most important and challenging problems in the project management field. In the past few years, many researches have been proposed for solving the RCPSP. The objective of this problem is to schedule the activities under limited resources so that the project makespan is minimized. This paper proposes a new algorithm for solving RCPSP that combines the concepts of negative selection mechanism of the biologic immune system, simulated annealing algorithm (SA), tabu search algorithm (TS) and genetic algorithm (GA) together. The performance of the proposed algorithm is evaluated and compared to current state-of-the-art metaheuristic algorithms. In this study, the benchmark data sets used in testing the performance of the proposed algorithm are obtained from the project scheduling problem library. The performance is measured in terms of the average percentage deviation from the critical path lower bound. The experimental results show that the proposed algorithm outperforms the state-of-the-art metaheuristic algorithms on all standard benchmark data sets. © 2012 ISAROB.
引用
收藏
页码:312 / 316
页数:4
相关论文
共 50 条
  • [1] An Orthogonal hybrid algorithm for the resource-constrained project scheduling problem
    Huang, Zhiyu
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 8292 - 8297
  • [2] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [3] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [4] A hybrid evolutionary algorithm for the resource constrained project scheduling problem
    Thammano, Arit
    Phu-ang, Ajchara
    PROCEEDINGS OF THE SEVENTEENTH INTERNATIONAL SYMPOSIUM ON ARTIFICIAL LIFE AND ROBOTICS (AROB 17TH '12), 2012, : 834 - 837
  • [5] A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem
    Shou, Yongyi
    Xiang, Wenwen
    Li, Ying
    Yao, Weijian
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [6] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721
  • [7] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [8] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [9] An efficient hybrid algorithm for resource-constrained project scheduling
    Chen, Wang
    Shi, Yan-jun
    Teng, Hong-fei
    Lan, Xiao-ping
    Hu, Li-chen
    INFORMATION SCIENCES, 2010, 180 (06) : 1031 - 1039
  • [10] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114