A biased random-key genetic algorithm for the project scheduling problem with flexible resources

被引:0
作者
Bernardo F. Almeida
Isabel Correia
Francisco Saldanha-da-Gama
机构
[1] Universidade de Lisboa,Departamento de Estatística e Investigação Operacional/Centro de Matemática, Aplicações Fundamentais e Investigação Operacional, Faculdade de Ciências
[2] Universidade Nova de Lisboa,Departamento de Matemática/Centro de Matemática e Aplicações, Faculdade de Ciências e Tecnologia
来源
TOP | 2018年 / 26卷
关键词
Resource-constrained project scheduling; Flexible resources; Biased random-key genetic algorithm; 90B35 (Scheduling theory, deterministic); 90C59 (Approximation methods and heuristics);
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we investigate a resource-constrained project scheduling problem with flexible resources. This is an NP\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\mathcal {NP}$$\end{document}-hard combinatorial optimization problem that consists of scheduling a set of activities requiring specific resource units of several skills. The goal is to minimize the makespan of the project. We propose a biased random-key genetic algorithm for computing feasible solutions for the referred problem. We study different decoding mechanisms: an already existing method in the literature, a new adapted serial scheduling generation scheme, and a combination of both. The new procedure is tested using a set of benchmark instances of the problem. The results provide strong evidence that the new heuristic is robust and yields high-quality feasible solutions.
引用
收藏
页码:283 / 308
页数:25
相关论文
共 68 条
[1]  
Alcaraz J(2001)A robust genetic algorithm for resource allocation in project scheduling Ann Oper Res 102 83-109
[2]  
Maroto C(2016)Priority-based heuristics for the multi-skill resource constrained project scheduling problem Expert Syst Appl 57 91-103
[3]  
Almeida BF(1999)Resource-constrained project scheduling: notation, classification, models, and methods Eur J Oper Res 112 3-41
[4]  
Correia I(2012)Project scheduling with flexible resources: formulation and inequalities OR Spectrum 34 635-663
[5]  
Saldanha-da-Gama F(2014)The impact of fixed and variable costs in a multi-skill project scheduling problem: an empirical study Comput Ind Eng 72 230-238
[6]  
Brucker P(2008)A genetic algorithm for the resource constrained multi-project scheduling problem Eur J Oper Res 189 1171-1190
[7]  
Drexl A(2011)Biased random-key genetic algorithms for combinatorial optimization J Heuristics 17 487-525
[8]  
Möhring R(2013)A biased random key genetic algorithm for 2D and 3D bin packing problems Int J Prod Econ 145 500-510
[9]  
Neumann K(2015)A biased random-key genetic algorithm for the unequal area facility layout problem Eur J Oper Res 246 86-107
[10]  
Pesch E(2011)A biased random-key genetic algorithm with forward–backward improvement for the resource constrained project scheduling problem J Heuristics 17 467-486