共 68 条
[1]
Alcaraz J(2001)A robust genetic algorithm for resource allocation in project scheduling Ann Oper Res 102 83-109
[2]
Maroto C(2016)Priority-based heuristics for the multi-skill resource constrained project scheduling problem Expert Syst Appl 57 91-103
[3]
Almeida BF(1999)Resource-constrained project scheduling: notation, classification, models, and methods Eur J Oper Res 112 3-41
[4]
Correia I(2012)Project scheduling with flexible resources: formulation and inequalities OR Spectrum 34 635-663
[5]
Saldanha-da-Gama F(2014)The impact of fixed and variable costs in a multi-skill project scheduling problem: an empirical study Comput Ind Eng 72 230-238
[6]
Brucker P(2008)A genetic algorithm for the resource constrained multi-project scheduling problem Eur J Oper Res 189 1171-1190
[7]
Drexl A(2011)Biased random-key genetic algorithms for combinatorial optimization J Heuristics 17 487-525
[8]
Möhring R(2013)A biased random key genetic algorithm for 2D and 3D bin packing problems Int J Prod Econ 145 500-510
[9]
Neumann K(2015)A biased random-key genetic algorithm for the unequal area facility layout problem Eur J Oper Res 246 86-107
[10]
Pesch E(2011)A biased random-key genetic algorithm with forward–backward improvement for the resource constrained project scheduling problem J Heuristics 17 467-486