共 16 条
- [14] Model experimental research on effect of material of immersed tunnel bottom surface on foundation formed by sand-flow method Li, W. (wl_scut@163.com), 2012, Academia Sinica (31):
- [15] Construction technique for the shallow-buried subway tunnel with large-section by long-distance horizontal ground freezing method and undermining method Zhongguo Tiedao Kexue/China Railway Science, 2011, 32 (01): : 75 - 80
- [16] The Researches on Construction Response and Excavation Method Optimization of Extra-large Cross-section Urban Subway Tunnel 2018 4TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING (ICEMEE 2018), 2018, 38