Sand Deposit Arrangement and Construction Optimization for Large-section Immersed Tube Tunnel Foundations via the Sand Flow Method

被引:0
|
作者
Ya-dong Li
Jie Cui
Hai-hong Mo
Wei Li
Jie Yuan
机构
[1] Guangzhou University,School of Civil Engineering
[2] South China University of Technology,School of Civil Engineering and Transportation
[3] Guangzhou Electric Power Design Institute,undefined
关键词
D O I
暂无
中图分类号
学科分类号
摘要
This study analyzes the distribution of the flow field in a foundation trench under different sand deposit arrangements based on the assumption of uniform sand-water mixed flow. Based on the influence of the sand deposit boundaries, this study investigated sand deposit arrangement and construction optimization. Results show the density of the sand deposit in parallel and alternative sand deposit arrangements. Sand deposits should be arranged symmetrically to simplify the sand deposit boundaries during construction to guarantee the overlapping of sand deposits in a large area and to prevent a sharp boundary from being produced. During sand deposit construction, regional linkage with the external water flow and symmetrical construction should be maintained to reduce sharp intersections between haped sand deposits. The sand-filling sequence for a large section of immersed tube tunnel with multirow sand deposits should be middle first, followed by each side.
引用
收藏
页码:324 / 329
页数:5
相关论文
共 16 条
  • [1] Sand Deposit Arrangement and Construction Optimization for Large-section Immersed Tube Tunnel Foundations via the Sand Flow Method
    Li, Ya-dong
    Cui, Jie
    Mo, Hai-hong
    Li, Wei
    Yuan, Jie
    SOIL MECHANICS AND FOUNDATION ENGINEERING, 2017, 54 (05) : 324 - 329
  • [2] Experiment and analysis of law of sand deposit expansion in foundation of immersed tube tunnel treated by sand flow method
    Fang, Yingguang
    Li, Wei
    Mo, Haihong
    Gu, Renguo
    Chen, Junsheng
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2012, 31 (01): : 206 - 216
  • [3] Formation of sand deposit in the process of foundation treatment by sand flow method for immersed tunnel
    Li, Yadong
    Mo, Haihong
    Chen, Junsheng
    Li, Wei
    Electronic Journal of Geotechnical Engineering, 2013, 18 Q : 3625 - 3636
  • [4] Model test of immersed tube tunnel foundation treated by sand-flow method
    Li, Wei
    Fang, Yingguang
    Mo, Haihong
    Gu, Renguo
    Chen, Junsheng
    Wang, Yizhao
    Feng, Deluan
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 40 : 102 - 108
  • [5] An impact imaging method for monitoring on construction of immersed tube tunnel foundation treated by sand-filling method
    Che, Ailan
    Zhu, Renjie
    Fan, Yanmin
    Feng, Shaokong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 85 : 1 - 11
  • [6] Numerical Simulation of Construction Method and Support Measures of Large-Section Tunnel
    Tao, Zhigang
    Chen, Jiayu
    Li, Yunpeng
    Zhou, Qianru
    Liu, Lei
    Lian, Huihui
    ENGINEERING GEOLOGY FOR A HABITABLE EARTH, VOL 4, IAEG XIV CONGRESS 2023, 2024, : 841 - 860
  • [7] Vertical displacement of tube segment of immersed tunnels caused by sand flow construction
    Li, Wei
    Fang, Ying-Guang
    Mo, Hai-Hong
    Gu, Ren-Guo
    Chen, Jun-Sheng
    Yuan, Wei-Yao
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2013, 35 (06): : 1102 - 1108
  • [8] Spatiotemporal Monitoring and Evaluation Method for Sand-Filling of Immersed Tube Tunnel Foundation
    Wu, Peng
    Che, Ailan
    APPLIED SCIENCES-BASEL, 2021, 11 (03): : 1 - 18
  • [9] Construction of a large-section tunnel adjacent to an existing tunnel by new pre-lining support method
    Fujishita, K
    Motomura, H
    Otsu, T
    Terauchi, S
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 685 - 690
  • [10] Numerical Analysis of Construction Method in Shallow-buried Large-section Loess Tunnel
    Sun, Zhijie
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 997 - 1000