共 16 条
- [2] Experiment and analysis of law of sand deposit expansion in foundation of immersed tube tunnel treated by sand flow method Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2012, 31 (01): : 206 - 216
- [3] Formation of sand deposit in the process of foundation treatment by sand flow method for immersed tunnel Electronic Journal of Geotechnical Engineering, 2013, 18 Q : 3625 - 3636
- [6] Numerical Simulation of Construction Method and Support Measures of Large-Section Tunnel ENGINEERING GEOLOGY FOR A HABITABLE EARTH, VOL 4, IAEG XIV CONGRESS 2023, 2024, : 841 - 860
- [7] Vertical displacement of tube segment of immersed tunnels caused by sand flow construction Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2013, 35 (06): : 1102 - 1108
- [8] Spatiotemporal Monitoring and Evaluation Method for Sand-Filling of Immersed Tube Tunnel Foundation APPLIED SCIENCES-BASEL, 2021, 11 (03): : 1 - 18
- [9] Construction of a large-section tunnel adjacent to an existing tunnel by new pre-lining support method TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 685 - 690
- [10] Numerical Analysis of Construction Method in Shallow-buried Large-section Loess Tunnel ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 997 - 1000