A particle swarm optimization approach for constraint joint single buyer-single vendor inventory problem with changeable lead time and (r,Q) policy in supply chain

被引:0
作者
Ata Allah Taleizadeh
Seyed Taghi Akhavan Niaki
Nima Shafii
Ramak Ghavamizadeh Meibodi
Armin Jabbarzadeh
机构
[1] Raja University,Department of Industrial Management
[2] Sharif University of Technology,Department of Industrial Engineering
[3] University of Porto,Faculty of Engineering
[4] Shahid Beheshti University,Department of Electrical and Computer Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2010年 / 51卷
关键词
Multi-product inventory; Stochastic demand; Changeable lead time; Supply chain; Integer nonlinear programming; Particle swarm optimization;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, the chance-constraint joint single vendor-single buyer inventory problem is considered in which the demand is stochastic and the lead time is assumed to vary linearly with respect to the lot size. The shortage in combination of back order and lost sale is considered and the demand follows a uniform distribution. The order should be placed in multiple of packets, the service rate limitation on each product is considered a chance constraint, and there is a limited budget for the buyer to purchase the products. The goal is to determine the re-order point and the order quantity of each product such that the chain total cost is minimized. The model of this problem is shown to be an integer nonlinear programming type and in order to solve it, a particle swarm optimization (PSO) approach is used. To assess the efficiency of the proposed algorithm, the model is solved using both genetic algorithm and simulated annealing approaches as well. The results of the comparisons by a numerical example, in which a sensitivity analysis on the model parameters is also performed, show that the proposed PSO algorithm performs better than the other two methods in terms of the total supply chain costs.
引用
收藏
页码:1209 / 1223
页数:14
相关论文
共 99 条
  • [1] Al-Tabtabai H(1999)Using genetic algorithms to solve optimization problems in construction Eng Con Arch Man 6 121-132
  • [2] Alex AP(1986)A joint economic lot size model for purchaser and vendor Decis Sci 17 292-311
  • [3] Banerjee A(1986)Inventory models involving lead time as a decision variable Journal of the Operational Research Society 45 579-582
  • [4] Ben-Daya M(2004)Integrated single vendor single buyer model with stochastic demand and variable lead time Int J Prod Econ 92 75-80
  • [5] Ben-Daya M(1990)Threshold accepting: a general purpose algorithm appearing superior to simulated annealing J Comput Phys 90 161-175
  • [6] Hariga M(2001)A new heuristic optimization algorithm: harmony search Simulation 76 60-68
  • [7] Dueck G(1988)Joint economic lot size model for purchaser and vendor: a comment Decis Sci 19 236-241
  • [8] Scheuer T(1989)Integrated inventory models: the vendor–buyer coordination Eur J Oper Res 41 261-269
  • [9] Geem ZW(2008)Optimization of integrated process planning and scheduling using a particle swarm optimization approach Int J Prod Res 40 1-22
  • [10] Kim JH(1999)Some stochastic inventory models with deterministic variable lead time Eur J Oper Res 113 42-51