Common due date assignment and single-machine scheduling with release times to minimize the weighted number of tardy jobs

被引:0
作者
Chuanli Zhao
机构
[1] Shenyang Normal University Shenyang,School of Mathematics and Systems Science
来源
Japan Journal of Industrial and Applied Mathematics | 2016年 / 33卷
关键词
Scheduling; Single-machine; Release time; Due date; 90B35;
D O I
暂无
中图分类号
学科分类号
摘要
In just-in-time production, meeting due dates is one of the most important goals. Motivated by a scenario of just-in-time production, this paper considers the single-machine scheduling problem with release times and common due date assignment. The objective is to determine the optimal due date and schedule simultaneously to minimize a cost function that includes the weighted number of tardy jobs and the due date assignment cost. We show that the problem is NP-hard in the ordinary sense, and propose a dynamic programming algorithm and a fully polynomial-time approximation scheme.
引用
收藏
页码:239 / 249
页数:10
相关论文
共 54 条
[21]  
Seidmann A(undefined)undefined undefined undefined undefined-undefined
[22]  
Shabtay D(undefined)undefined undefined undefined undefined-undefined
[23]  
Steiner G(undefined)undefined undefined undefined undefined-undefined
[24]  
Shabtay D(undefined)undefined undefined undefined undefined-undefined
[25]  
Wu CC(undefined)undefined undefined undefined undefined-undefined
[26]  
Cheng SR(undefined)undefined undefined undefined undefined-undefined
[27]  
Wu WH(undefined)undefined undefined undefined undefined-undefined
[28]  
Yin YQ(undefined)undefined undefined undefined undefined-undefined
[29]  
Wu WH(undefined)undefined undefined undefined undefined-undefined
[30]  
Wu CC(undefined)undefined undefined undefined undefined-undefined