Research on the control of overburden deformation by filling ratio of cementing filling method with continuous mining and continuous backfilling

被引:0
|
作者
Bin Xu
Zhongwen Yue
Yongliang Li
Shushuai Wang
Jin Li
Bin Lu
机构
[1] China University of Mining and Technology-Beijing,School of Mechanics and Architecture Engineering
[2] China University of Mining and Technology-Beijing,School of Energy and Mining Engineering
关键词
Continuous mining and continuous backfilling method; Filling ratio; Backfill; Deformation of the surrounding rock;
D O I
暂无
中图分类号
学科分类号
摘要
Underground resource exploitation has seriously damaged the surface ecological environment and underground water system. As an effective control measure, the filling mining process has greatly reduced the surface subsidence. As a branch of the filling mining process, the continuous mining and continuous backfilling (CMCB) method solves the contradiction of mining and filling in this process. The control index of filling ratio of even number lane (FRE) was presented to investigate the technical advantages of the CMCB method. The numerical analysis model was used to investigate the laws such as deformation characteristics of the surrounding rock, stress distribution, and plastic area distribution characteristics of backfill under four typical cases. As a consequence, the FRE effect law on overburden deformation and the roof control function of the backfill was disclosed, and overburden rock deformation control solutions were provided. According to the results, the overburden deformation varies dramatically when the FRE decreases, and it rises greatly when the even-numbered lane backfill (ELB) is not contacted with the roof. The contacting condition and filling condition of the odd numbered lane backfill (OLB) are connected to the distribution of stress and plastic zone. The backfill transmits the rock beam load by building a composite support system with the roof and floor rock layers, and it accomplishes the backfill’s roof control function by combining the primary and secondary load-bearing and synergistic load-bearing connections between the backfills. Measures such as differential FRE, differential strength, non-uniformity of filling lane, and synergistic bearing of temporary support and backfill may help to decrease deformations and internal cracks in the surrounding rock. This measure has been successfully implemented in the field, serving as an experience for the application of the CMCB method.
引用
收藏
页码:26764 / 26777
页数:13
相关论文
共 50 条
  • [1] Research on the control of overburden deformation by filling ratio of cementing filling method with continuous mining and continuous backfilling
    Xu, Bin
    Yue, Zhongwen
    Li, Yongliang
    Wang, Shushuai
    Li, Jin
    Lu, Bin
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2023, 30 (10) : 26764 - 26777
  • [2] Analysis on Filling Ratio and Shield Supporting Pressure for Overburden Movement Control in Coal Mining with Compacted Backfilling
    Huang, Yanli
    Li, Junmeng
    Song, Tianqi
    Kong, Guoqiang
    Li, Meng
    ENERGIES, 2017, 10 (01)
  • [3] Characteristics of overburden migration under continuous extraction and continuous backfill mining method with CO2 mineralized filling materials
    Xu, Yujun
    Ma, Liqiang
    JOURNAL OF CLEANER PRODUCTION, 2024, 440
  • [4] Asymmetric Deformation Mechanism of Roadway with Continuous Mining and Continuous Backfilling
    Weihao Zhu
    Feng Wang
    Shaojie Chen
    Dawei Yin
    Jingkui Zhou
    Zeqi Jie
    Yulong Zou
    Rock Mechanics and Rock Engineering, 2024, 57 : 2125 - 2142
  • [5] Asymmetric Deformation Mechanism of Roadway with Continuous Mining and Continuous Backfilling
    Zhu, Weihao
    Wang, Feng
    Chen, Shaojie
    Yin, Dawei
    Zhou, Jingkui
    Jie, Zeqi
    Zou, Yulong
    ROCK MECHANICS AND ROCK ENGINEERING, 2024, 57 (03) : 2125 - 2142
  • [6] Research Progress and Development Direction of Filling Cementing Materials for Filling Mining in Iron Mines of China
    Cao, Hui
    Gao, Qian
    Zhang, Xizhi
    Guo, Bin
    GELS, 2022, 8 (03)
  • [7] Technique of continuous mining and filling in deep well
    Yu, Jian
    Dai, Xingguo
    Huang, Rendong
    Zhongnan Gongye Daxue Xuebao/Journal of Central South University of Technology, 2000, 31 (06): : 481 - 484
  • [8] Cemented Backfilling Mining Technology for Gently Inclined Coal Seams Using a Continuous Mining and Continuous Backfilling Method
    Lu, Bin
    Li, Yongliang
    Fang, Shizheng
    Lin, Hai
    Zhu, Ye
    SHOCK AND VIBRATION, 2021, 2021
  • [9] Cemented backfilling mining technology with continuous mining and continuous backfilling method for underground coal mine and typical engineering cases
    Li Y.
    Lu B.
    Yang R.
    Lin H.
    Xu B.
    Wang S.
    Liu C.
    Meitan Xuebao/Journal of the China Coal Society, 2022, 47 (03): : 1055 - 1071
  • [10] Deformation mechanism and control technology of gob-side roadway with continuous mining and continuous backfilling: a case study
    Chen, Dingchao
    Wang, Xiangyu
    Bai, Jianbiao
    Zhang, Feiteng
    GEOMATICS NATURAL HAZARDS & RISK, 2024, 15 (01)