Heuristic procedure for the economic lot-sizing problem with remanufacturing and recovery targets

被引:8
作者
Piñeyro P. [1 ]
Viera O. [1 ]
机构
[1] Department of Operations Research, Institute of Computer Science, Faculty of Engineering, Universidad de la República, Montevideo
关键词
Lot-Sizing problem with remanufacturing; Optimization; Recovery targets;
D O I
10.1007/s13243-018-0044-z
中图分类号
学科分类号
摘要
We address a production-remanufacturing planning problem of a single item with recovery targets stated as a lower bound on the numbers of returns that must be remanufactured. This problem can arise in practice if there are legal or market pressures. We show that this problem extension can be considered a generalization of the traditional problem without recovery targets, which is a well-known NP-hard problem even for the cost structure considered in this paper. A polynomial-time heuristic procedure is suggested, with different criteria for determining the periods with positive remanufacturing, which results in two different variants of the heuristic. To evaluate the heuristic, we extend a benchmark set of large instances of the literature in order to include different cost and recovery target settings. The results obtained from the numerical experiment allow us to conclude that the heuristic is cost- and time-effective for many scenarios of cost and recovery targets. However, the performance of the heuristic decreases as recovery targets increase. In addition, we note that our heuristic is able to achieve an optimal solution for many instances, even with a higher remanufacturing rate than the optimal solution obtained by a commercial solver. © 2018, Springer Science+Business Media B.V., part of Springer Nature.
引用
收藏
页码:39 / 50
页数:11
相关论文
共 40 条
[1]  
Akartunali K., Arulselvan A., Economic lot-sizing problem with remanufacturing option: complexity and algorithms, Lect Notes Comput Sci, 10122, pp. 132-143, (2016)
[2]  
Arora P., Why Oem's Go for Remanufacturing: The Not So Obvious Drivers, (2016)
[3]  
Baki M.F., Chaouch B.A., Abdul-Kader W., A heuristic solution procedure for the dynamic lot sizing problem with remanufacturing and product recovery, Comput Oper Res, 43, 1, pp. 225-236, (2014)
[4]  
Barquet A.P., Rozenfeld H., Forcellini F.A., An integrated approach to remanufacturing: model of a remanufacturing system, J Remanuf, 3, 1, pp. 1-11, (2013)
[5]  
Cunha J.O., Melo R.A., A computational comparison of formulations for the economic lot-sizing with remanufacturing, Comput Ind Eng, 92, pp. 72-81, (2016)
[6]  
Esenduran G., Kemahlioglu-Ziya E., Swaminathan J.M., Take-back legislation: consequences for remanufacturing and environment, Decis Sci, 47, 2, pp. 219-256, (2016)
[7]  
Esenduran G., Kemahlioglu-Ziya E., Swaminathan J.M., Impact of take-back regulation on the remanufacturing industry, Prod Oper Manag, 26, 5, pp. 924-944, (2017)
[8]  
Ferguson M., Guide V., Koca E., Souza G., The Value of Quality Grading in Remanufacturing, Prod Oper Manag, 18, 3, pp. 300-314, (2009)
[9]  
Golany B., Yang J., Yu G., Economic lot-sizing with remanufacturing options, IIE Trans, 33, 11, pp. 995-1003, (2001)
[10]  
Gungor A., Gupta S.M., Issues in environmentally conscious manufacturing and product recovery: a survey, Comput Ind Eng, 36, 1, pp. 811-853, (1999)