Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation

被引:0
作者
Ziyad Bahou
Mohamed Reda Lemnaouar
Issam Krimi
机构
[1] Mohammed V University in Rabat,Mohammadia School of Engineers
[2] Mohammed V University in Rabat,Superior School of Technology Salé, LASTIMI
[3] Abu Dhabi University,College of Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2024年 / 130卷
关键词
Production planning; Interdependencies-induced degradation; Preventive maintenance scheduling; Ordinary differential system; Integer programming;
D O I
暂无
中图分类号
学科分类号
摘要
Integrating preventive maintenance (PM) scheduling and production planning efficiently remains challenging for researchers and practitioners alike, owing to complex component interdependencies. Existing studies often lack practicality due to oversimplified assumptions. In this paper, we propose a two-stage solution for the integrated PM scheduling and production planning problem within multi-parallel component manufacturing systems, accounting for diverse interdependencies. These interdependencies encompass stochastic, structural, economic, and resource-related interdependencies, all while accounting for the resultant degradation. The primary objective is jointly optimizing costs associated with holding, backorders, production, setup, and maintenance. Initially, we employ an Ordinary Differential System to compute a realistic production capacity. Additionally, we analyze the effects of interdependence-induced degradation on system availability and failures. Subsequently, we formulate the problem as an integer programming model to determine an optimal joint plan. The effectiveness of our approach is validated through numerical examples and sensitivity analysis, providing insightful guidance for efficient PM scheduling and production planning, particularly in large-scale production systems.
引用
收藏
页码:4723 / 4749
页数:26
相关论文
共 191 条
[41]  
Senoussi A(2019)Reliability and availability analysis of standby systems with working vacations and retrial of failed components Reliab Eng Syst Saf 182 107366-494
[42]  
Aguilar H(2021)Reliability and availability analysis of a retrial system with mixed standbys and an unreliable repair facility Reliab Eng Syst Saf 205 267-512
[43]  
García-Villoria A(2021)Evaluation of the availability and reliability of a standby repairable system incorporating imperfect switchovers and working breakdowns Reliab Eng Syst Saf 207 1-351
[44]  
Pastor R(2019)Assessing offshore wind turbine reliability and availability Proceedings of the Institution of Mechanical Engineers, Part M: Journal of Engineering for the Maritime Environment 233 521-2163
[45]  
Xi W(2019)Reliability and availability models of belt drive systems considering failure dependence Chin J Mech Eng 32 36-1480
[46]  
Yang H(2015)Optimal maintenance planning for repairable multi-component systems subject to dependent competing risks IIE Transactions 47 466-170
[47]  
Lu L(2018)Joint optimization of maintenance policy and inspection interval for a multi-unit series system using proportional hazards model J Oper Res Soc 69 327-345
[48]  
Zhou W(2016)Optimal number of minimal repairs with cumulative repair cost limit for a two-unit system with failure rate interactions Int J Syst Sci 47 481-438
[49]  
Chen Z(2023)Availability modelling and analysis of a two-component parallel system under stochastic dependence Int J Math Oper Res 26 507-11634
[50]  
Turng LS(2004)Integration planning for technology intensive acquisitions R &d Management 34 344-314