Multi-objective stochastic scheduling of job ready times

被引:0
|
作者
Paul M. Stanfield
Russell E. King
Thom J. Hodgson
机构
来源
Annals of Operations Research | 1997年 / 70卷
关键词
Genetic Algorithm; Service Time; Ready Time; Stochastic Schedule; Minimum Acceptable Level;
D O I
暂无
中图分类号
学科分类号
摘要
A fundamental scheduling problem is to determine a production start (ready) time based on customer-specified due dates. Typically, the objective is to delay the ready time in an attempt to minimize work-in-process inventory and maximize production system utilization. In many practical situations, highly variable service times complicate this problem. In such a case, the ready time implies a level of on-time completion confidence for each job. As the ready time increases, the on-time confidence decreases. This paper investigates the ready time/job confidence level tradeoff. A multi-objective model balances the ready time and confidence level maximization goals. The model involves combinatorial and numerical optimization and has an exceptionally complex state space. In view of these complexities, we investigate a pairwise interchange heuristic and a genetic algorithm search solution. Experimental results support solution through a process involving both the heuristic and the genetic algorithm.
引用
收藏
页码:221 / 239
页数:18
相关论文
共 50 条
  • [41] An improved MOEA/D for multi-objective job shop scheduling problem
    Zhao, Fuqing
    Chen, Zhen
    Wang, Junbiao
    Zhang, Chuck
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2017, 30 (06) : 616 - 640
  • [42] Multi-Objective Job Shop Scheduling Based on Multiagent Evolutionary Algorithm
    Duan, Xinrui
    Liu, Jing
    Zhang, Li
    Jiao, Licheng
    SIMULATED EVOLUTION AND LEARNING, 2010, 6457 : 543 - 552
  • [43] A simulated multi-objective model for flexible job shop transportation scheduling
    Yiyi Xu
    M’hammed Sahnoun
    Fouad Ben Abdelaziz
    David Baudry
    Annals of Operations Research, 2022, 311 : 899 - 920
  • [44] Approach of hybrid GA for multi-objective job-shop scheduling
    Meng, Qiaofeng
    Zhang, Linxuan
    Fan, Yushun
    INTERNATIONAL JOURNAL OF MODELING SIMULATION AND SCIENTIFIC COMPUTING, 2016, 7 (04)
  • [45] A Memetic Algorithm for the Multi-Objective Flexible Job Shop Scheduling Problem
    Yuan, Yuan
    Xu, Hua
    GECCO'13: PROCEEDINGS OF THE 2013 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2013, : 559 - 566
  • [46] Particle swarm optimization based multi-objective job shop scheduling
    School of Automation, Wuhan Univ. of Technology, Wuhan 430070, China
    不详
    Shanghai Jiaotong Daxue Xuebao, 2007, 11 (1796-1800):
  • [47] An artificial bee colony approach for multi-objective job shop scheduling
    Scaria, Abyson
    George, Kiran
    Sebastian, Jobin
    1ST GLOBAL COLLOQUIUM ON RECENT ADVANCEMENTS AND EFFECTUAL RESEARCHES IN ENGINEERING, SCIENCE AND TECHNOLOGY - RAEREST 2016, 2016, 25 : 1030 - 1037
  • [48] Disruption management of multi-objective flexible job shop scheduling problem
    Sun, Jinghua
    Xu, Li
    Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 50 - 56
  • [49] A simulated multi-objective model for flexible job shop transportation scheduling
    Xu, Yiyi
    Sahnoun, M'hammed
    Ben Abdelaziz, Fouad
    Baudry, David
    ANNALS OF OPERATIONS RESEARCH, 2022, 311 (02) : 899 - 920
  • [50] A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem
    Frutos, Mariano
    Tohme, Fernando
    OPERATIONAL RESEARCH, 2013, 13 (02) : 233 - 250