共 40 条
[1]
Aquilano N. J.(1980)A formal set of algorithms for project scheduling with critical path method-material requirements planning Journal of Operations Management 1 57-67
[2]
Smith D. E.(1990)Simple solution procedures for a class of two-echelon inventory problems Operations Research 38 64-69
[3]
Axsater S.(2004)Quadrant homes applies lean concepts in a project environment Interfaces 34 442-450
[4]
Brown K.(2001)Integrated project scheduling and material planning with variable activity duration and rewards IIE Transactions 33 1005-1018
[5]
Schmitt T. G.(2000)Optimizing strategic safety stock placement in supply chains Manufacturing & Service Operations Management 2 68-83
[6]
Schonberger R. J.(2005)Optimizing the supply chain configuration for new products Management Science 51 1165-1180
[7]
Dennis S.(1995)Customer-order information, leadtimes, and inventories Management Science 41 1599-1607
[8]
Dodin B.(1998)Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies European Journal of Operational Research 109 646-659
[9]
Elimam A. A.(1995)A survey on the resource-constrained project scheduling problem IIE Transactions 27 574-586
[10]
Graves S. C.(2004)Scheduling recurrent construction Naval Research Logistics 51 1102-1128